IT-Grundschutz in hospitals: making clinical dependencies visible

IT-Grundschutz in a hospital is above all about making clinical dependencies visible: which applications, devices, networks, rooms and service providers does a treatment process need, and what happens if one of them fails? BSI Standard 300-1 of the Bundesamt für Sicherheit in der Informationstechnik (BSI), the German Federal Office for Information Security, explicitly requires these dependencies for business processes with high protection requirements, and the standard names „Beeinträchtigung der persönlichen Unversehrtheit“ (our translation: "impairment of personal physical integrity") as a damage scenario that can help in determining high protection requirements. This page briefly places the requirements of Section 391 of Book V of the German Social Code (SGB V) and the BSI Act (BSIG) in context, uses a fictitious process from the emergency department to show a dependency map, and names the requirements of the user catalogue (Anwenderkatalog) that apply to medical technology, remote maintenance and emergency operation. The page does not prepare proof of compliance for critical infrastructure (KRITIS-Nachweis).

Night-time corridor of an intensive care unit with no people, in the foreground the nurses' station with a wall of monitoring screens, in the background dimmed light and closed glass doors to the patient rooms

Determining the protection requirements of treatment processes

Grundschutz++ starts with the business process. Business processes „können Abläufe, Verwaltungsverfahren und Fachverfahren verstanden werden“ (our translation: "can be understood as workflows, administrative procedures and specialist procedures") (300-1 chapter 2.5). In a hospital, besides administration and billing, these are above all the treatment processes, such as admission, diagnostics, medication, surgery and discharge. Protection requirements are set for each process for confidentiality, integrity and availability, in the categories "normal" and "high". According to chapter 2.6, high means that the impact can be considerable. As an aid, the standard names damage scenarios, including „Beeinträchtigung der persönlichen Unversehrtheit“ (our translation: "impairment of personal physical integrity"). The scenarios are an aid. The institution makes the classification and top management approves it (chapter 2.10).

For treatment processes, it seems reasonable to assume that a falsified medication entry or an unavailable result can impair the physical integrity of patients. If a process is classified as "high" for this reason, two obligations follow. First, an explicit risk assessment is required if a business process has high protection requirements for at least one protection goal (chapter 2.11). Second, the membership and dependency of the assets in relation to this process must be documented (chapter 3.2). The standard recommends starting the initial set-up with the most important business process from the highest protection requirements category (chapter 2.6). Step by step, all processes within the scope are to be examined.

Top management defines the scope. It can cover the entire hospital or part of it (300-1 chapter 2.3). If the hospital belongs to a group with several sites, a central IT company or a medical care centre (Medizinisches Versorgungszentrum), these boundaries and their interfaces must be clarified when delimiting the scope.

How the classification works in detail is described on the page Protection requirements determination; how to delimit the information domain, on the page Delimiting the information domain.

Documenting dependencies: the resource path of a treatment process

When documenting assets, BSI Standard 300-1 differentiates according to protection requirements. For normal protection requirements, the dependencies between applications and IT systems and between IT systems and rooms are sufficient. For high protection requirements, the membership and dependency of the assets in relation to the business process must be documented. According to chapter 3.2, the documentation is „unter anderem für die spätere Risikobetrachtung erforderlich, da diese auf Ebene des Geschäftsprozesses und entlang des Ressourcenpfades durchgeführt wird.“ (our translation: "required, among other things, for the subsequent risk assessment, as this is carried out at the level of the business process and along the resource path.") The form is up to you: table, CMDB, service map, network plan or dependency overview.

For a hospital, this means that the path does not end at the hospital information system (HIS). A treatment process also includes interfaces between systems, networked devices, the network segments they are connected to, manufacturers' remote maintenance access, server rooms, the power supply and external service providers. Chapter 3.1 also requires the interfaces of the information domain to external processes and systems to be clearly documented, at organisational, technical and infrastructure level. The dependency map below shows the path using a fictitious example, with the target object category (Zielobjektkategorie) from Annex 1 of 300-1 and the catalogue reference for each asset.

Dependency map: emergency department with laboratory result (fictitious extract)

The example is fictitious: a general hospital (Regelversorgung) with its own emergency department, central laboratory and hospital information system. The business process "GP-K01 Emergency care with laboratory result" is classified as "high" for integrity and availability, because a falsified or delayed result can impair treatment. Names, dependencies and fallbacks are assumptions for the example. The map is a simplified extract: telephone system, printers, authentication service, specimen transport and further resources are missing. The "depends on" column distinguishes dependencies in operation from dependencies for maintenance. The map mainly considers failures. For integrity, a second case belongs here too: the systems are running, but results or their assignment to patients could be falsified. Record who then restricts use of the affected information, has its reliability checked and releases it again.

According to the guidance on the methodology requirement STM.2.1.2, every asset is given a responsible role or an asset owner. For treatment processes, the clinical side is part of this: the consequences of failure, the fallbacks and the return to normal operation are confirmed by the medical and nursing management of the department and by the laboratory management, rather than by IT or medical technology alone. This division is our suggestion.

No.Asset (fictitious)Target object category (300-1 Annex 1)depends onConsequence of failure for GP-K01 (assumption)Fallback you documentCatalogue reference
A01Hospital information system (HIS), emergency department moduleApplicationsOperation: A03, A04, A07Laboratory requests and viewing of results not possible electronicallyPaper requests, results passed on by telephone with call-back; check the telephone system and forms themselves as assetsNOT.3.1 (SOLLTE, i.e. SHOULD) recovery plan; NOT.3.2 (KANN, i.e. MAY) business continuity plan
A02Laboratory information system (LIS)ApplicationsOperation: A03, A05, A07The assumption is a disruption of transmission: results are produced but do not reach the HIS. If the results function itself fails, a different fallback is needed.Printout in the laboratory, messenger or fax according to a defined list; printer and fax route with their own dependenciesNOT.3.1; NOT.4.15 (SOLLTE) recovery procedure
A03Interface server between HIS, LIS and devicesHost systemsOperation: A06, A09Requests and results back up; assignment to patients uncertainAfter recovery, reconcile patient, specimen and request, handle buffered messages, avoid duplicate requests, enter results transmitted on paper or by telephone retrospectively; document technical recovery and the clinical release of normal operation separatelyASST.2.2 (SOLLTE) inventory of systems; NOT.4.17 (KANN) application test after recovery
A04Workstations in the emergency departmentIT systemsOperation: A06, A10No data entry at the treatment areaSpare devices, paper documentationASST.2.2
A05Networked laboratory analysers (medical devices)IT systems; justify the assignmentOperation: A06; maintenance: A08The assumption is a disruption of the connection: analyses run, results are not sent to the LIS automatically. If the device fails, a replacement device or the external laboratory takes over.Manual transfer with dual control (four-eyes check)ARCH.2.2.5 (SOLLTE) OT systems, if you classify the devices this way; BES.2.1.6 (SOLLTE) support and maintenance contracts
A06Medical technology network segmentInternal network segmentsOperation: A09, A10Devices and interface server cut offRecovery plan for the segmentARCH.2.1 (SOLLTE) network segments; ARCH.2.2.7 (SOLLTE) management network
A07Database and application servers of HIS and LISHost systemsOperation: A09, A10HIS, LIS and interfaces fail togetherRecovery in a defined order according to the emergency manualNOT.4.2 (SOLLTE) system backup; NOT.4.16 (SOLLTE) backup test
A08Device manufacturer's remote maintenance accessExternal network connections; servicesOperation: A06No direct failure of the process; troubleshooting on A05 is delayed; risk of unauthorised access to A05Access only after activation, disconnection in an incidentKONF.4.3, KONF.4.4 (SOLLTE) authenticate and restrict remote maintenance, assigned via A05 (IT systems); ASST.5.6 (KANN) supervision of external maintenance
A09Server roomServer roomsOperation: A10Failure of all servers in the roomAlternative operation according to the emergency manualRequirements of the target object category Server rooms and of the higher-level categories
A10Technical room with uninterruptible power supplyRooms for technical infrastructureOperation: building services, emergency generatorFailure of all dependent assets after the bridging timeShutdown sequence, contact person in building servicessee page Buildings and emergency preparedness
A11External laboratory for specialist analysesOutsourcingOperation: specimen transport, transmission of resultsSpecialist results delayedAgreed alternative route for transmitting resultsDLS.3.1.1 (SOLLTE) audit or certificate
A12Emergency department and laboratory staffUsers; employees-Fallback is not applied if it is unknownInstruction in and practice of the fallbackNOT.3.3 (SOLLTE) awareness of the procedure in an emergency; SENS.1.1 (MUSS, i.e. MUST) procedures and rules

The assignment of categories and catalogue references is our suggestion. A fallback only helps if it works during the failure under consideration, so also record the dependencies of telephone, fax, printers and spare devices. Through inheritance under 300-1 chapter 3.4.2, each asset also receives the requirements of the higher-level categories; the column only gives examples. Requirements assigned to several assets of the same category appear only once in the requirements package (chapter 3.4). How to record assets and assign categories is described on the pages Structure analysis and Modelling with target object categories.

Resource path of the fictitious process GP-K01 Emergency care with laboratory result as a top-down tree: at the top the business process with high protection requirements for integrity and availability, below it HIS and LIS, below them the interface server, database and application servers, workstations and laboratory analysers, below those the medical technology network segment with the server room to its left, at the very bottom the technical room with power supply. Solid lines for dependencies in operation, dashed for the manufacturer's remote maintenance access as a marked external interface for maintenance. To the right, the external laboratory as outsourcing. At each node a small symbol for the documented fallback.
Dependencies of a treatment process with high protection requirements under BSI Standard 300-1 chapters 3.1 and 3.2, target object categories under Annex 1. Fictitious example, own illustration, as of 1 November 2026.

Medical technology, remote maintenance and manufacturers in the requirements package

Annex 1 of 300-1 has no target object category of its own for medical devices. Networked devices can be assigned to the IT systems category, which the standard defines as „Informationstechnische Systeme zur elektronischen Datenverarbeitung“ (our translation: "information technology systems for electronic data processing"). Check for each device type whether the requirements of this category cover a device adequately. If they do not, chapter 2.11 requires an explicit risk assessment „wenn ein für den Informationsverbund relevantes Asset durch die bestehenden Zielobjektkategorien und die ihnen zugeordneten Anforderungen nicht hinreichend abgedeckt wird“ (our translation: "if an asset relevant to the information domain is not adequately covered by the existing target object categories and the requirements assigned to them"). For this, chapter 3.4.3 provides for supplementary requirements in the catalogue format. Obligations under medical device law are not covered by this page.

If a requirement cannot be implemented on a device, for example because the manufacturer does not permit any change to the configuration, "not applicable" under 300-1 chapter 4.1.1 is only permissible for one of the two reasons given there: the underlying component does not exist in the information domain, or the requirement cannot be fulfilled functionally. The justification must be documented. If an applicable SOLLTE requirement remains unfulfilled for the foreseeable future, chapter 2.11 likewise requires an explicit risk assessment.

How to assess such cases is described on the page Assessing requirements and handling deviations.

In the user catalogue (build 2026-10-29), these requirements in particular apply to medical technology and manufacturer access:

IdentifierTitleModal verbRelevance to medical technology (our classification)
ASST.2.2Inventory of systemsSOLLTEBesides end devices, the guidance also names IoT devices, provided they process data from the information domain. Networked devices therefore belong in the inventory.
ARCH.2.1Network segmentsSOLLTEDivision of the internal network according to requirements and protection requirements; the guidance names operational technology and building management systems as examples.
ARCH.2.2.5OT systemsSOLLTERestrict connections between OT systems and other IT systems. Whether you treat medical devices as OT systems is for you to decide and justify.
ARCH.2.2.7Management networkSOLLTEAdministration and maintenance via a separate network.
KONF.4.3Authentication of remote maintenance functionsSOLLTERemote maintenance by manufacturers only after authentication according to the rules of the practice (Praktik) BER.
KONF.4.4Restriction of remote maintenance functionsSOLLTELimit remote maintenance functions to what is necessary.
BES.2.1.6Support and maintenance contractsSOLLTEDocument the need for support and maintenance contracts according to the protection requirements for availability.
ASST.5.6Maintenance by external partiesKANNSupervision by internal staff during maintenance by external parties without a security clearance, security level "elevated (erhöht)".

KANN requirements have the security level "elevated (erhöht)" and are optional. They can be drawn on in the risk assessment (300-1 chapter 3.4.2). How procurement and service provider management interact is shown on the page Practice: procurement and service providers; target configuration and inventory on the page Practice: configuration and assets.

Emergency operation, recovery and awareness

The "fallback" column of the dependency map leads to emergency planning. The user catalogue requires a recovery plan for time-critical systems and applications (NOT.3.1, SOLLTE). According to the guidance, it specifies how a failed resource is brought to a planned emergency operation level within a recovery time. Without a BCMS, the time-critical resources can be identified via the protection requirements determination with high protection requirements for availability. In the catalogue, a business continuity plan for time-critical business processes is a KANN requirement (NOT.3.2). As an example of emergency operation, the guidance expressly names a digitally supported process being carried out in analogue form again, and it assigns business continuity plans to the responsibility of a BCMS.

Classifying a process as "high" does not replace time planning. How long a process may be interrupted, what minimum emergency operation level is needed and how long manual operation can be sustained are things you define with those clinically responsible. The recovery plan under NOT.3.1 presupposes such recovery times. If a BCMS exists, they are produced in the business impact analysis under BSI Standard 200-4 chapter 7. For a hospital, this also means that the paper forms, telephone lists and messenger runs from the dependency map only become a fallback once they are documented, distributed and practised. The catalogue requires users to be made aware of the procedure in emergencies and crises (NOT.3.3, SOLLTE) and, as a MUSS requirement, a procedure for role-specific training and awareness (SENS.1.1). This provides a point of connection for the awareness measures under Section 391(2) SGB V. Whether your measures fulfil the statutory obligation is a legal question.

Emergency management under BSI Standard 200-4 does not replace Grundschutz++; 200-4 has not been superseded by 300-1. How to combine the two is described on the page BSI Standard 200-4; the failure of a site as a case worked through from start to finish on the page Practice: buildings and emergency preparedness. How to plan instruction sessions and check their effect is set out on the page Practice: awareness.

B3S Krankenhaus and Grundschutz++ side by side

A hospital that applies or intends to apply the B3S may still want to work according to Grundschutz++, for example because the hospital operator runs several facilities using a uniform methodology or is aiming for ISO 27001 certification on the basis of IT-Grundschutz. In the sources evaluated (as of 1 November 2026), the BSI has not published a mapping between the B3S Krankenhaus and the Grundschutz++ user catalogue. Anyone using both creates the mapping themselves and labels it as their own.

This page does not describe the content of the B3S. According to the BSI, it is available for download on the website of the Deutsche Krankenhausgesellschaft. Methodologically, requirements from the B3S can be handled like any other contractual or sector-specific obligation: they belong in compliance management (300-1 chapter 2.2), and anything the user catalogue does not cover is added to the requirements package (chapter 3.4.3). Which framework leads for your hospital and whether it fulfils the obligations under Section 391 SGB V or the BSI Act is decided by top management and the legal department.

The trade-off between the ISO route and the IT-Grundschutz route is described on the page ISO 27001 or IT-Grundschutz.

Approach for a hospital

The steps follow the process steps from 300-1. The order and the link to the dependency map are our suggestion.

  1. Have the requirements established: The legal department records which obligations under Section 391 SGB V and the BSI Act apply and whether a B3S is applied. The result goes into compliance management (300-1 chapter 2.2).
  2. Scope and processes: Top management defines the scope and approves the protection requirements of the processes (chapters 2.3, 2.10). Choose a treatment process with high protection requirements as the first one (chapter 2.6).
  3. Clarify roles: Name the information security officer (ISB), head of IT, medical technology, building services, data protection and the clinical leads for the processes under consideration (medical and nursing management, laboratory management), with responsibilities and interfaces. Avoid conflicts of interest between the head of IT and the ISB and between the data protection officer (DSB) and the ISB (chapter 2.8). The page Roles and responsibilities can help.
  4. Create the dependency map: For the chosen process, document the resource path down to devices, network segments, remote maintenance, rooms and service providers (chapters 3.1, 3.2). Use existing sources such as the medical device inventory, CMDB and network plans.
  5. Build the requirements package: Assign assets to target object categories, flag devices that are not adequately covered and formulate supplementary requirements (chapters 3.4.2, 3.4.3).
  6. Risk assessment and fallbacks: Carry out an explicit risk assessment for the process and for assets that are not covered (chapter 2.11); include fallbacks in the recovery plan and practise them (NOT.3.1, NOT.3.3). Procedure and minimum criteria (Mindestkriterien) are described on the page Risk analysis.

Blackfort Technology supports hospitals with scoping, the dependency map, the requirements package and the risk assessment under Grundschutz++. The packages are listed on the page Consulting. For general information on setting up an ISMS and on ISO 27001, see the company website at https://www.blackfort-tec.de/en and https://www.blackfort-tec.de/en, and on the external information security officer at https://www.blackfort-tec.de/en. If the hospital belongs to a university, the page IT-Grundschutz at universities describes the delimitation on the university side.

Rights notice: Quotations from BSI Standard 300-1 © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI topic page Grundschutz++. Quotation and information on B3S © Bundesamt für Sicherheit in der Informationstechnik, source: BSI page on industry-specific security standards and BSI page B3S Krankenhaus, retrieved on 1 November 2026. They are not licensed under CC BY-SA 4.0. The licence notice at the bottom of the page applies only to the extracts from the catalogue data.

Frequently asked questions

Does a hospital have to implement IT-Grundschutz?
Section 391 SGB V obliges hospitals to take appropriate precautions in line with the state of the art, but does not prescribe a particular framework. Subsection 4 expressly names the application of an industry-specific security standard whose suitability the BSI has established. The provision does not mention IT-Grundschutz. Your legal department checks which obligations apply to your hospital.
What is the B3S Krankenhaus?
An industry-specific security standard of the Deutsche Krankenhausgesellschaft, titled on the BSI page „Branchenspezifischer Sicherheitsstandard für die Gesundheitsversorgung im Krankenhaus“ (industry-specific security standard for healthcare in hospitals). The BSI lists it in version 1.3.1 with the suitability determination expiring in November 2028, in the section for standards whose suitability was established under Section 8a(2) BSIG in its former version. According to the BSI, there is no legal obligation to draw up a B3S. Key details: BSI page B3S Krankenhaus.
Is an IT-Grundschutz ISMS proof of compliance for critical infrastructure (KRITIS)?
This page does not prepare a KRITIS proof of compliance. Operators of critical facilities prove implementation under Section 39 BSIG through security audits, inspections or certifications. The BSI may set requirements for how these are carried out and for the suitability of the proof (Section 39(2)). Whether your hospital operates a critical facility and which proof is recognised is for you to clarify with your legal department and on the basis of the BSI's specifications.
How do I represent medical devices in Grundschutz++?
BSI Standard 300-1 has no target object category of its own for medical devices. Networked devices can be assigned to the IT systems category. If its requirements do not adequately cover a device, an explicit risk assessment is required under chapter 2.11, and you add your own requirements (chapter 3.4.3). In the catalogue, ASST.2.2, ARCH.2.1, ARCH.2.2.5, KONF.4.3 and KONF.4.4, among others, apply.
What protection requirements does a treatment process have?
The hospital determines this for each process and top management approves it. BSI Standard 300-1 names „Beeinträchtigung der persönlichen Unversehrtheit“ (our translation: "impairment of personal physical integrity") as a damage scenario that can be used as an aid to determining high protection requirements. High protection requirements call for an explicit risk assessment and for documentation of the assets' dependencies on the process (chapters 2.11, 3.2).

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859 of 2026-10-30)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.