BSI Standard 200-4: connecting business continuity management with Grundschutz++

BSI Standard 200-4 (BSI 200-4) „Business Continuity Management“, version 1.0 of May 2023, published by the Bundesamt für Sicherheit in der Informationstechnik (BSI), the German Federal Office for Information Security, describes how an organisation builds a management system for continuing its business operations in emergencies and crises; it replaced emergency management (Notfallmanagement) under BSI Standard 100-4. BSI Standard 300-1 „Methodik Grundschutz++“ does not replace 200-4, and the Grundschutz++ user catalogue (Anwenderkatalog) refers to it several times in the practice (Praktik) NOT. This page shows what a BCMS under 200-4 and an ISMS under Grundschutz++ can use jointly, what remains in the requirements package even with a BCMS, and offers a reading path through the standard for Grundschutz users.

Open dark blue emergency case with brass corners on a wooden bench in an entrance hall, containing a torch, battery radio, rope, wool blanket and sealed envelopes, with a coat hanging on the wall beside it

What 200-4 is and where it stands

According to its change history, 200-4 is a redesign based on 100-4, aligned with ISO 22301:2019. New compared with 100-4 are, among other things, the tiered model, the term business continuity management (BCM) instead of emergency management, the process steps preliminary analysis (Voranalyse), now the BIA pre-filter (BIA-Vorfilter), and target/actual comparison (Soll-Ist-Vergleich), consideration of the interfaces to information security, IT service continuity management and crisis management, and a more detailed description of the response organisation. Version 1.0 of May 2023 adjusted the definition of recovery time (Wiederanlaufzeit), introduced the response time of the special organisational structure (Besondere Aufbauorganisation, BAO) and renamed the preliminary analysis to BIA pre-filter.

A BCMS can be built in three tiers: reactive BCMS (Reaktiv-BCMS), build-up BCMS (Aufbau-BCMS) and standard BCMS (Standard-BCMS) (ch. 2.6). The reactive BCMS is meant to enable an organisation quickly to respond to emergencies and is to be developed further after one cycle; the build-up BCMS initially covers a limited set of business processes; the standard BCMS considers all business processes in scope. According to ch. 1.3, the standard BCMS tier conforms to ISO 22301:2019, and a fully implemented and operated standard BCMS reaches the maturity for ISO 22301 certification. On the standard itself, the BSI states on its website: „Derzeit ist noch keine Zertifizierung zu dem Standard geplant.“ (our translation: "No certification for the standard is planned at present.") (retrieved on 1 November 2026). For experienced users, the BSI offers a requirements catalogue with the MUSS and SOLLTE requirements (must and should) of the standard BCMS and a mapping to ISO 22301:2019.

For the connection with Grundschutz, one sentence from ch. 1.3 matters: „Ein ISMS wird explizit für diesen BSI-Standard nicht vorausgesetzt.“ (our translation: "An ISMS is explicitly not a prerequisite for this BSI standard.") 200-4 continues the series 200-1 to 200-3 and, in many places, points to synergy potential with the ISMS in dedicated boxes. The examples there refer to an ISMS under BSI Standard 200-2 or ISO 27001. The standard does not yet contain such notes for Grundschutz++; the transfer to 300-1 in the tables below is our assessment.

Relationship to BSI Standard 300-1 and the user catalogue

300-1 mentions a BCMS in one place: according to ch. 2.5, process maps and existing management systems such as a BCMS can be used when identifying the business processes. 300-1 contains no sentence that replaces 200-4 or sets it aside for Grundschutz++. The BSI milestone plan (Meilensteinplan, as of October 2026) lists the integration of other management systems into Grundschutz++ for 2027 and later; which ones and in what form is not stated there.

The Grundschutz++ user catalogue (build of 29 October 2026) makes the connection in the practice NOT. NOT.1.1.4 provides, as a KANN requirement (may), for establishing a BCMS under BSI Standard 200-4; its parameters are the tier (reactive, build-up or standard BCMS) and the standard. The guidance recommends ideally meeting the requirements of the practice through a BCMS, with a reactive BCMS as the first step. The guidance on eight further NOT requirements refers to individual chapters of 200-4. A BCMS is therefore optional, the practice NOT is not: 25 of its 37 requirements have no target object category (Zielobjektkategorie) and, under 300-1 ch. 3.4.1, must be included in the requirements package.

In classic IT-Grundschutz, module DER.4 Emergency Management of the IT-Grundschutz Compendium is to be applied once for the entire information domain. In Edition 2023 (as of February 2023), it still refers to BSI Standard 100-4 for the phases of emergency management; version 1.0 of 200-4 dates from May 2023. Since, according to its change history, 200-4 replaces Standard 100-4, 200-4 is today the current version for this content. How the Compendium continues to be used until classic certifiability ends is described on the page IT-Grundschutz Compendium.

What BCMS and ISMS can share and what stays separate

Both management systems ask about business processes, resources, damage and risks. They ask with a different aim, though. An ISMS protects normal operations in all three protection goals, BC safeguards above all limit the extent of a damaging event that has occurred (200-4 ch. 2.4.1). 200-4 gives an example: an application with high availability in the ISMS can remain without a continuity requirement in BCM if emergency operations manage without it; for another one, the business impact analysis can tighten the requirement because the process has to run again after a few hours. The table sorts the points of contact. The references for 200-4 are the synergy boxes and the related body text of the standard, those for Grundschutz++ the chapters of 300-1.

TopicBCM under 200-4ISMS under Grundschutz++Can be sharedKeep separate
ScopeOrienting towards the ISMS scope can make sense but must fit the objectives (ch. 3.3)Scope of application and information domain (300-1 ch. 3.1)Delimitation and known resources as a starting pointObjectives of the BCMS, which may require a different cut
Business processesProcesses from the ISMS as a basis; the same level of detail as in the ISMS can make sense (ch. 7.1.1)Business processes are to be identified and documented, a BCMS may be used (ch. 2.5)one joint process list, in both directionsClassification as time-critical: BCM focuses on the time-critical business processes (ch. 2.1), which only the BIA determines
StakeholdersCheck whether to adopt the stakeholder analysis (ch. 4.2)Analysis of interested parties (ch. 2.4)List of parties and their requirementsExpectations that concern continuity only
Damage categoriesDamage scenarios and categories from the protection requirements determination as a basis (ch. 7.1.2)two categories, normal and high, per business process (ch. 2.6)Description of the damage scenariosTime grading and intolerability level of the BIA; two categories are not enough for that
AssessmentThe BIA looks at resources for emergency operations, the protection requirements determination at normal operations; a joint survey is not advantageous in all cases (ch. 7.1.5)Protection requirements determination per business process (ch. 2.6)joint appointments and tools where the same categories applyResults: availability in normal operations and continuity in emergency operations are different values
ResourcesAdopt names from the structure analysis; its grouping will probably not match the BCM resource clusters (ch. 7.1.3)Assets and dependencies (ch. 3.2)Asset and resource names, responsible persons (ch. 8.1)Clusters and groups
Riskno method of its own; focus on risks to the availability of time-critical resources (ch. 9.1, 9.3); the same categories as in the ISMS make a lot of sense (ch. 9.5)Free choice of method, minimum criteria (Mindestkriterien) from Annex 3 binding (ch. 2.11)Method, scales, risk categories, one integrated risk treatment plan (ch. 2.4.1)Selection of threats: confidentiality and integrity remain a task of the ISMS
RolesThe information security officer (ISB) and the BC officer can be the same person if there are no conflicting topics and resources suffice; the standard advises against combining the role with IT service continuity management (ch. 3.5)Roles and responsibilities (ch. 2.8)Coordination and deputisingProcess ownership per management system
Emergency operations and protection goalsDefine the interfaces between BCMS and ISMS early, because protection goals can compete in emergency operations (ch. 4.2.3)alternative security mechanisms for emergencies (NOT.3.6)a joint rule for exceptions in emergency operationsthe decision during an incident lies with the BAO
Exercises and reportsCoordinate the annual exercise plan with other exercises (ch. 13.3); joint reporting has advantages (ch. 2.4.1)Performance evaluation and management review (ch. 5)one exercise calendar, one report to top management in two partsObjectives and indicators per management system

Column "BCM under 200-4": synergy boxes and body text in BSI Standard 200-4, version 1.0; the synergy boxes refer to an ISMS under 200-2 or ISO 27001. Column "ISMS under Grundschutz++": BSI Standard 300-1, version 1.0. The columns "Can be shared" and "Keep separate" are our own assessment.

Two overlapping ellipses, on the left BCMS under BSI Standard 200-4 with business impact analysis, emergency operations, business continuity plans and recovery times, on the right ISMS under Grundschutz++ with protection requirements normal and high, requirements package, risk assessment for all three protection goals. In the overlap, under "can be shared": business process list, scope, resource names, risk method and scales, exercise calendar, report to top management. Below, a band headed "Stays in the requirements package, with or without a BCMS" stating that 25 of 37 requirements of the practice NOT have no target object category (mandatory under ch. 3.4.1) and the rest apply via the assets, with the chips NOT.1.1 to NOT.1.1.3 and NOT.1.2 (MUSS, MUST), NOT.2.1 BAO (special organisational structure), NOT.3.1 restart plan and NOT.4 data backup, and a dashed line to the BCMS for requirement NOT.1.1.4 (KANN, MAY) as the optional connection
Points of contact between a BCMS under BSI Standard 200-4 and an ISMS under BSI Standard 300-1, with the practice NOT from the Grundschutz++ user catalogue, build 2026-10-29. Own illustration, as of 1 November 2026.

What stays in the requirements package even with a BCMS

A BCMS under 200-4 can give substance to many NOT requirements. The guidance on NOT.2.1 says, in essence, that with a BCMS under 200-4, whatever its tier, the requirements for the special organisational structure (BAO) are generally met. The status must nevertheless be checked and evidenced for each requirement: under 300-1 ch. 4.1.1, the current implementation status of every requirement must be fully reviewed. The table shows where the guidance in the catalogue points and what then remains in the ISMS.

Requirement (modal verb)Reference in the guidance to 200-4What a BCMS providesWhat remains in the ISMS
NOT.1.1.4 BCMS (KANN)ch. 2.6 tiered modelthe management system itself, in the chosen tierthe decision whether and in which tier, and its status in the package
NOT.2.1 BAO (SOLLTE)ch. 5 setting up and enabling the BAOCrisis team, core team, response teams, rules of procedureEvidence of the status; interface to the handling of security incidents
NOT.2.1.1 Roles (SOLLTE)ch. 5.1Staffing of the BAOEvidence of the assignment
NOT.2.1.2 Alerting (SOLLTE)ch. 5.2Detection, reporting, classification, alertingConnection of the reporting channels for security events
NOT.2.1.3 Crisis team room (KANN)ch. 5.6.3Designation and equipment of the crisis team roomProtection of the crisis team room, including a virtual one
NOT.2.1.4 Crisis team exercise (KANN)ch. 13.6Exercise planning, execution, evaluationScenarios related to information security, such as malware
NOT.3.1 Restart plan (SOLLTE)ch. 12 restart and recovery planningcritical resources and recovery times from the BIA, framework from the BC strategieswithout a BCMS: time-critical IT resources from the protection requirements determination, recovery time only roughly estimated
NOT.3.2 Business continuity plan (KANN)ch. 11 business continuity planningEmergency operations per time-critical business processaccording to the guidance only optional in the ISMS
NOT.3.4 Functional test (KANN)ch. 13.9 functional test and 13.5 plan walkthroughTests of the plans and emergency operation resourcesCheck whether security precautions are effective in emergency operations
NOT.1.1 to NOT.1.1.3 and NOT.1.2 (MUSS)nonePolicy and procedures of the BCMSProcedure for emergency preparedness in information security, documentation, assignment, communication, review
NOT.3.5, NOT.3.6 (SOLLTE)noneAlternative communication as a BC solutionAlternative telecommunications and alternative security mechanisms in an emergency
NOT.3.3 (SOLLTE), NOT.4 Data backup (20 requirements)noneRequirements for recovery time and permissible data lossRaising users' awareness of the procedure in an emergency; concept, retention, encryption, offline copy and tests of the data backup

Column "Reference": guidance in the Grundschutz++ user catalogue, build 2026-10-29. The columns "What a BCMS provides" and "What remains in the ISMS" are our own assessment.

What an ISMS under Grundschutz++ does not take over

Conversely, the requirements package does not replace a BCMS. The user catalogue does not require a business impact analysis with maximum tolerable downtime, required recovery time, maximum permissible data loss and emergency operation level (200-4 ch. 7); the business continuity plan is a KANN requirement there. The two protection requirements categories normal and high do not say how long a process may be down. And the risk assessment of the ISMS cannot be handed over to the BCM risk analysis: according to 200-4 ch. 9.1, the latter generally considers the risks to availability, whereas 300-1 ch. 2.11 already requires an explicit risk assessment when a business process has high protection requirements in at least one protection goal, including confidentiality or integrity.

How far an organisation needs a BCMS depends on its business processes and on the rules that apply to it. We classify the rules you name or that appear in your documents; whether they apply legally is checked by your legal department. For getting started where there are legal or regulatory requirements, 200-4 recommends the build-up or standard BCMS rather than the reactive BCMS (ch. 2.6.1). How gaps show up in a specific outage is played through for a site failure on the page Buildings and emergency preparedness.

Reading path through 200-4 for Grundschutz users

200-4 is extensive and structured along the BCM process. From chapter 3 onwards, each chapter heading states which tier the chapter applies to: R for reactive BCMS, A for build-up BCMS, S for standard BCMS, AS for build-up and standard BCMS together (ch. 1.3). If you initially want to implement only a reactive BCMS, read only the chapters marked R. The following order is tailored to readers who operate or are building an ISMS under Grundschutz++.

  1. Terms and tiers first: ch. 2.1 (disruption, emergency, crisis; time-critical business processes; BAO), 2.3 (timeline of the response) and 2.6 (tiered model). The standard itself recommends these three chapters as minimum reading for everyone with prior BCM experience.
  2. Interface to the ISMS: ch. 2.4.1, with the differences between availability in normal operations and continuity in emergency operations. Then ch. 2.4.2 on IT service continuity management, if IT operations keep their own emergency plans.
  3. For top management: ch. 3, initiation by top management with objectives, scope, choice of tier and appointment of the BC officer.
  4. Put next to NOT.2.1: ch. 5 on the BAO, in particular 5.1, 5.2 and 5.6.
  5. Put next to the protection requirements determination: ch. 6 (BIA pre-filter, for reactive and build-up BCMS) and ch. 7 (business impact analysis). This is where you decide which data you collect jointly.
  6. Put next to Annex 3 of 300-1: ch. 9 (BCM risk analysis, for build-up and standard BCMS). Check whether your risk method covers both purposes.
  7. For NOT.3.1 and NOT.3.2: ch. 12 (restart planning, AS) and ch. 11 (business continuity planning).
  8. For NOT.2.1.4 and NOT.3.4: ch. 13 on exercising and testing, with plan walkthrough, crisis team exercise, alerting exercise and functional test.
  9. For a final cross-check: the requirements catalogue for the standard, which summarises the MUSS and SOLLTE requirements of the standard BCMS in compact form, and for operation ch. 14 and 15.

Further reading: protection requirements per business process on the page Protection requirements determination, checking the risk method on the page Checking the risk method, the classic risk method on the page BSI Standard 200-3, the site failure as a scenario on the page Buildings and emergency preparedness, the method as a whole on the page BSI Standard 300-1, module DER.4 in context on the page IT-Grundschutz Compendium.

Placing existing BCM documents in Grundschutz++

If you already have an emergency manual, a BAO or a BCMS under 100-4 or 200-4, you do not have to start again for Grundschutz++. The documents are evidence for the status of the NOT requirements, provided they are current and cover the requirement. In the Readiness and migration concept package, Blackfort Technology checks which requirements of the practice NOT existing documents already evidence and where gaps remain.

Rights notice: Quotations and information from BSI Standard 200-4 © Bundesamt für Sicherheit in der Informationstechnik 2023, source: BSI Standard 200-4; the quotation on certification comes from this web page. Information from BSI Standard 300-1 and the milestone plan © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI, Grundschutz++. Information from the IT-Grundschutz Compendium, Edition 2023 © 2023 Reguvis Fachmedien GmbH, © 2023 Bundesamt für Sicherheit in der Informationstechnik, Bonn (as stated in the imprint of the edition), source: IT-Grundschutz Compendium. They are not licensed under CC BY-SA 4.0; the licence notice at the end of the page applies to the extracts from the catalogue data.

Frequently asked questions

What is BSI Standard 200-4?
BSI Standard 200-4 „Business Continuity Management“, version 1.0 of May 2023, describes how to build and operate a BCMS in three tiers: reactive, build-up and standard BCMS. It replaced BSI Standard 100-4 „Notfallmanagement“ (emergency management). The standard BCMS tier conforms to ISO 22301:2019.
Has BSI 200-4 been replaced by Grundschutz++?
No. BSI Standard 300-1 does not replace 200-4. The Grundschutz++ user catalogue names a BCMS under 200-4 in NOT.1.1.4 as a KANN requirement and refers to chapters of 200-4 in several guidance texts of the practice NOT.
Do I need an ISMS for 200-4?
No. 200-4 ch. 1.3: „Ein ISMS wird explizit für diesen BSI-Standard nicht vorausgesetzt.“ (our translation: "An ISMS is explicitly not a prerequisite for this BSI standard.") An ISMS can support building and operating a BCMS, for example through joint business process lists and risk scales.
Can you get certified under BSI Standard 200-4?
The BSI writes on the page about the standard: „Derzeit ist noch keine Zertifizierung zu dem Standard geplant.“ (our translation: "No certification for the standard is planned at present.") (retrieved on 1 November 2026). According to 200-4 ch. 1.3, a fully implemented standard BCMS reaches the maturity for ISO 22301 certification.
What is the difference between BSI 100-4 and 200-4?
200-4 is a redesign based on 100-4, aligned with ISO 22301:2019. Among other things, it introduces the tiered model, the term business continuity management instead of emergency management, the preliminary analysis (now the BIA pre-filter) and the target/actual comparison, takes into account the interfaces to information security, IT service continuity management and crisis management, and describes the response organisation in more detail.

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call
Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859 of 30 Oct 2026)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

  • Identifiers, titles, modal verbs, target object categories and parameters as well as verbatim or abridged requirement texts of NOT.1.1, NOT.1.1.4, NOT.1.2, NOT.2.1, NOT.2.1.1 to NOT.2.1.4, NOT.3.1 to NOT.3.6; count of the requirements of the practice NOT and of group NOT.4; paraphrased guidance on NOT.1.1.4, NOT.2.1, NOT.3.1, NOT.3.2 and NOT.3.4, including the chapter references to BSI Standard 200-4 contained therein; texts translated into English: BSI State-of-the-Art Library, Grundschutz++ user catalogue (build 2026-10-29, commit c3f37859 of 30 Oct 2026), practice NOT, retrieved 2026-11-01. Shortened, translated or edited by Blackfort Technology.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.