Grundschutz++ readiness: assessment of your existing ISMS and migration concept

The Grundschutz++ readiness analysis assesses your existing ISMS against BSI Standard 300-1 of the German Federal Office for Information Security (Bundesamt für Sicherheit in der Informationstechnik, BSI) and the Grundschutz++ user catalogue (Anwenderkatalog), and plans the way there. Package B delivers the gap analysis as a delta list, a check of your risk method against the 35 minimum criteria (Mindestkriterien) and a migration concept with order and responsibilities. Package A delivers the decision paper for your top management on framework and timing of the switch.

Desk by the window in the evening with two stacks of documents side by side, a brass ruler between them, an open dark blue folder and a brass lamp switched on

Starting point

You run an ISMS under the IT-Grundschutz Compendium 2023 or under ISO 27001 and want to know what a switch to Grundschutz++ means for you and when it pays off. The method is set out in BSI Standard 300-1, version 1.0 of 20 October 2026. According to the milestone plan (Meilensteinplan), certifications based on Grundschutz++ can be applied for from 1 January 2027, and classic IT-Grundschutz remains certifiable until 30 November 2031.

The changes affect the foundations of your documentation: protection requirements per business process with two categories instead of three, modelling via 39 target object categories (Zielobjektkategorien), an implementation status without "partially" and "dispensable", MUSS (MUST) requirements without exception approval and a risk method that meets the minimum criteria of Annex 3. The BSI mapping table from the Compendium 2023 to Grundschutz++ is a draft. Its mappings need a professional check before you transfer evidence on that basis.

Scope of services

Both packages can be commissioned individually. The decision paper for top management belongs to package A. The delta list, the check of the risk method and the migration concept belong to package B.

Decision and transition planning

Choice of framework between classic IT-Grundschutz, ISO 27001 without reference to Grundschutz and Grundschutz++; timeline up to 2031 with your recertification dates; recommendation on the timing of the switch. We assess the requirements and client demands you name, or that appear in your documents, from an information security perspective. Whether and how they legally apply to you is for your legal department to assess.

Method delta

Comparison of your approach with 300-1: business processes and protection requirements, mapping from three to two categories, modelling from modules to target object categories, status model, handling of MUSS and SOLLTE (SHOULD) requirements.

Comparison using the mapping tables

Initial coverage via the BSI mapping tables from the Compendium 2023 and from ISO/IEC 27001:2022 Annex A to Grundschutz++. We check each mapping on which you want to base evidence individually, because the Compendium mapping is a draft.

Check of the risk method

Your procedure under BSI Standard 200-3, ISO/IEC 27005 or your own method against the 35 minimum criteria of Annex 3, with a finding and the evidence needed for each criterion.

The 35 minimum criteria

Migration concept

Order starting from the first business process, work packages with inputs and results, responsibilities, dates and sign-off points, aligned with your recertification date.

Grundschutz++ migration

Format of the results

You receive all results in editable formats, with chapter references to 300-1 and the catalogue build used.

  1. 01

    Decision paper (package A)

    Three to five pages for top management: framework, timing, resources, open points, proposed resolution.

  2. 02

    Delta list (package B)

    Per area and practice (Praktik): existing state, requirement under 300-1, finding, consequence; effort according to the effort level the catalogue gives for each requirement in the field effort_level.

  3. 03

    Risk method criteria matrix (package B)

    35 rows, per minimum criterion: provided for, unclear or missing, with the reference in your procedure and the evidence needed.

  4. 04

    Checked mappings (package B)

    List of the mappings from the BSI tables on which you rely, with our professional finding for each mapping.

  5. 05

    Migration plan (package B)

    Work packages, order, responsibilities, dates and sign-off points up to the goal.

Excerpt from a delta list

Fictitious example with invented figures. It shows how a finding becomes a consequence in the migration plan.

AreaExisting state under 200-2 and Compendium 2023Requirement under 300-1FindingConsequence in the migration plan
Protection requirementsthree categories, inherited per target objecttwo categories per business process (chapter 2.6)two processes so far "very high"mapping to "high", explicit risk consideration for both processes
Implementation status14 requirements at "partially""fulfilled", "not fulfilled" or "not applicable" (chapter 4.1.1)status to be reassessedreassessment; classify unfulfilled SOLLTE requirements as temporary or permanent
Dispensability9 requirements at "dispensable""not applicable" if the requirement cannot be fulfilled functionally or the component is missing; justification per requirement (chapter 4.1.1)3 justifications do not match the new definitionplan safeguards, or risk consideration in case of permanent non-fulfilment
Risk methodprocedure under 200-3, risk appetite described, not authorisedauthorisation by top management (Annex 3, criterion 9)gapsubmission for authorisation at the next management meeting
Modellingmodules of the Compendium 2023target object categories under Annex 1; BSI mapping is a draft41 mappings checked, 6 differ in substancedocument and justify your own mapping

Fictitious example. Chapter references refer to BSI Standard 300-1, version 1.0 of 20 October 2026.

Process and acceptance

Fixed points at which you see and approve results.

  1. 1

    Scoping

    Initial call, review of the documents, definition of the information domain and scope; then a binding offer.

  2. 2

    Survey

    Review of the documentation and workshops with the information security officer (ISB), IT operations and the owners of the business processes.

  3. 3

    Draft

    The commissioned results (package B: delta list, criteria matrix, migration plan; package A: decision paper) as a draft to your contact person.

  4. 4

    Acceptance

    Results meeting, correction round, acceptance by your contact person. For package A, the decision paper goes to top management.

The offer sets the sign-off points and the scope of the correction round.

Process from left to right: the existing ISMS (Compendium 2023 or ISO 27001) goes into three assessments of package B (method delta, BSI mapping tables, risk method against 35 minimum criteria) and leads to the main results delta list, criteria matrix and migration plan. Next to them, visually set apart, the decision paper for top management (package A), which can also be commissioned alone. Sign-off points after scoping, draft and acceptance are marked.
Readiness analysis process with sign-off points. Basis: BSI Standard 300-1, version 1.0 of 20 October 2026. Own illustration.
Christian Gebhardt, founder and managing director of Blackfort Technology

Your contact

Christian Gebhardt, founder and managing director of Blackfort Technology, is happy to take your enquiry personally. In a free initial call you work out together what you need; the consulting is carried out by the Blackfort Technology team.

About Blackfort TechnologyProfile on LinkedIn

What we need from you

Documents

Information security policy, structure analysis, protection requirements determination, modelling, results of the IT-Grundschutz Check, risk analyses and risk method, last audit report; for ISO 27001 the statement of applicability and the risk treatment plan.

Tool export

If you use an ISMS tool: an export of the modelling and the implementation status.

Contact person

An internal coordinator for dates, queries and acceptance.

Business units and IT operations

One meeting each with the owners of the most important business processes and with IT operations.

Top management

For package A, a meeting to present the decision paper.

Exclusions

The readiness analysis assesses and plans. Not included are:

  • Implementing the safeguards and the new modelling itself. That is package C "Implementation and migration".
  • A statement on whether you will pass a certification audit. The analysis is neither a certification forecast nor an audit.
  • An overall score in per cent or a seal. You receive findings per area and criterion.
  • Legal advice. Whether and how requirements legally apply to you is for your legal department to assess.
  • Selecting or introducing an ISMS tool.
  • Ongoing operation and external information security officer (package D); link under "Further reading".

We do not publish prices on this website. After the initial call you receive a binding offer for the agreed scope.

Frequently asked questions

What is a Grundschutz++ readiness analysis?

An assessment of your existing ISMS against BSI Standard 300-1 and the Grundschutz++ user catalogue. It shows what you can carry over, what changes and what is new, and leads to a migration plan (package B). The decision paper for top management is package A.

How do a gap analysis and a migration concept differ?

The gap analysis establishes where your existing ISMS deviates from 300-1, as a delta list with findings. The migration concept sets out in which order, with which responsibilities and by when you close the deviations.

Can we simply adopt the BSI mapping from the Compendium 2023 to Grundschutz++?

It is useful as initial coverage. However, the mapping table has the status "draft" in the BSI repository. Mappings on which you base evidence should be checked professionally, and the check should be documented.

Will we get a maturity level in per cent at the end?

No. You receive findings per area and criterion and a plan for closing the gaps. A percentage would hide the fact that 300-1 only knows "fulfilled", "not fulfilled" or "not applicable" for each requirement, and that MUSS requirements allow no exception.

Further reading

Get in touch

Request a readiness analysis

Tell us your basis (Compendium 2023 or ISO 27001), the information domain and your next audit date. In the free initial call we clarify the scope.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859); mapping IT-Grundschutz 2023 to Grundschutz++ as of 2026-07-21, status draft

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.