Grundschutz++ example, part 1: survey and planning at the fictitious IT special-purpose association

This Grundschutz++ example follows an invented municipal IT service provider, the IT Special-Purpose Association Sample Region (IT-Zweckverband Musterregion, IZM), through all five process steps of BSI Standard 300-1 from the Bundesamt für Sicherheit in der Informationstechnik (BSI), the German Federal Office for Information Security. Part 1 shows the survey and planning for its portal operation: context, compliance list, business processes, protection requirements, roles, risk framework and the decisions of executive management. The result is the planning file with fixed identifiers that are reused in parts 2 to 5, together with the status of the methodology requirements at the end of this step, including the gaps and open decisions.

Project room in a 19th-century brick building with a long oak table holding tied plan rolls, an unrolled floor plan, a brass lamp and an archive box, and through arched windows the inner courtyard with a lime tree

What this case file is and is not

Fictitious case. The IT Special-Purpose Association Sample Region, its municipalities, systems, people, figures and decisions are invented. The case file has not been reviewed by the BSI, is not certified and cannot be transferred to real municipalities or service providers. It shows what the requirements of BSI Standard 300-1 can look like in a file and does not replace an assessment in your organisation.

Common source status for all five parts: BSI Standard 300-1 "Methodik Grundschutz++" (Grundschutz++ methodology), version 1.0 of 20 October 2026, and the Grundschutz++ user catalogue (Anwenderkatalog), build of 29 October 2026 (commit c3f37859 of 30 October 2026). Identifiers and texts of requirements come from this build, and we counted all quantities ourselves. The file covers project months PM 1 to PM 15; later months appear only as planned deadlines. Counting in project months is meant to prevent dates from looking like events that actually happened.

In the milestone plan on its Grundschutz++ page, the BSI has announced its own application example for December 2026, based on the fictitious example authority "BDIT". This case file is independent of it and may differ from it.

The case file in five parts:

  1. Survey and planning (this page)
  2. Requirements analysis: information domain, assets, requirements package
  3. Implementation: implementation status, risk register, implementation plan
  4. Monitoring: metrics, internal audit, management review
  5. Improvement: nonconformities, corrective action plan, effectiveness review

The methodology itself is explained on the topic pages that each section refers to. This page only records what the IZM decided and documented.

Profile: the IT Special-Purpose Association Sample Region

The following assumptions apply unchanged to all five parts. They were chosen so that as many rules of 300-1 as possible come into play: many clients, a shared portal, external editorial teams and a server room in the basement on a river.

CharacteristicAssumption in the case (fictitious)
OrganisationIT Special-Purpose Association Sample Region (IZM), supported by twelve municipalities K01 to K12; around 180 employees
Top managementExecutive management of the IZM (role R-01); it decides within the resolutions of the association assembly
Area under considerationPortal Services division with 14 employees: operation of the shared citizen portal through which residents of the twelve municipalities submit applications online
Locationone site with an administration building and a technical building; server room RZ-1 in the basement of the technical building, the site lies on a river
Starting pointno ISMS based on IT-Grundschutz, individual security rules in IT operations, a data protection officer, a part-time information security officer (ISB)
Triggerthe service agreements with the municipalities require an ISMS based on BSI Grundschutz; the IZM starts directly with Grundschutz++ (on choosing the route, see Grundschutz++ now or later)
Source status300-1 version 1.0; user catalogue build 2026-10-29
Timeline of the case file across project months 1 to 15 with the five process steps of BSI Standard 300-1 as sections, the position of parts 2 to 5 shown schematically. Below part 1 the results: context, business processes GP-A to GP-D, protection requirements, roles and policy, risk framework, and the decision papers EV-01 to EV-06, with the ISB post deferred under EV-04, and below that the open points. On the right a box with the note: fictitious case, not reviewed by the BSI, not certified.
Case file IT Special-Purpose Association Sample Region, part 1 within the five process steps of BSI Standard 300-1, version 1.0. Fictitious example, own illustration, as of 1 November 2026.

Identifier scheme of the case file

Every object in the file receives an identifier when it first appears, and that identifier never changes afterwards. If an object is discarded, its identifier stays assigned and receives a note. This makes decisions from part 1 traceable even in the audit in part 4.

PrefixObjectfrom part
K01 to K12municipality (client)1
K13joining municipality4
KX, CP, IPcontext factor, compliance requirement, interested party1
L, DL, KRgap, document control rule, communication rule1
GP-A to GP-Dbusiness processes in scope1
Rrole in the security organisation1
Z, LLsecurity objective, policy1
EVdecision paper for executive management1
OFopen question or open decision1
IV, S, ASinformation domain, interface, asset2
EIGown requirement of the IZM (not a BSI requirement)2
B, Pfinding from the asset inventory, resource path2
RR, RS, MN, NWrisk, residual risk of a planned requirement, safeguard, evidence3
KZ, FS, MB, SVmetric, audit finding, management review, security event4
NK, SW, VP, KVnonconformity, systemic weakness, improvement potential, entry in the corrective and improvement plan5

Requirements keep their identifier from the user catalogue, for example GC.6.1. The IZM's own requirements carry the prefix EIG so that nobody mistakes them for catalogue texts. K1 to K7 denote the criteria of the assessment matrix on the protection requirements determination page and are not objects of the file.

Context, compliance list and interested parties

Chapters 2.1 to 2.4 of 300-1 require external and internal influencing factors, legal and contractual requirements and the expectations of interested parties to be recorded. The standard does not ask for a long report for this; essential aspects are to be recorded briefly (chapter 2.1). The IZM added a consequence for the ISMS to every row so that it is clear later where the factor reappears.

IdentifierFactor or requirement (fictitious)Consequence for the ISMSreappears in part
KX-01site on a river, server room in the basement (external factor; 300-1 gives a location on a river as an example, ch. 2.1.1)flooding as a topic for site requirements and risk assessment3
KX-02twelve municipalities with their own specialist applications (Fachverfahren) to which the portal hands over applicationsmany external interfaces, coordination with twelve clients2
KX-03staff shortage in IT operations, part-time ISB (internal factor lack of resources, ch. 2.1.2)allocation of resources as a separate decision paper1, 3
KX-04forms are maintained by the municipalities' own editorial teamsexternal users with far-reaching rights in the portal2, 4
CP-01service agreements with K01 to K12, including the requirement for an ISMS based on BSI Grundschutztrigger for the project; contractual requirements for handover and availability2
CP-02data processing agreements with the municipalitiesrequirements for deletion periods and reporting channels3
CP-03maintenance contract with the manufacturer of the portal software, with remote accessservice within the information domain2
CP-04possible state-law requirements on information security for municipal service providersopen question OF-02 to the IZM's legal department2
IP-01municipalities as clients: expect evidence and handover without lossevidence planning, reports to the association assembly4
IP-02residents: expect confidentiality of their applications and a portal that is availableprotection requirements GP-A1
IP-03staff council: co-determination on logging and analysis of accessinvolvement before log analyses are introduced3
IP-04data protection officer of the IZMconsultation on protection requirements and deletion periods1

Gap L-01: The current service agreements for municipalities K07 and K11 were not available when part 1 was completed. The compliance list is therefore incomplete. The IZM documented the gap openly instead of assuming the content from the other municipalities' contracts.

Open question OF-02: The ISB did not assess personally whether state-law requirements on information security apply to the IZM as a municipal service provider. The question lies with the legal department. In such cases we classify the requirements that an organisation names or that appear in its documents; whether they apply legally is checked by its legal department.

Under chapter 2.4, the organisation determines, in agreement with top management, which binding obligations are included in the ISMS as requirements. In the case these are CP-01 to CP-03. Where the catalogue does not already cover them, they give rise to the IZM's own requirements in part 2.

Scope and business process list

Executive management set the scope as the Portal Services division at the IZM's site (EV-01). Excluded are the IZM's internal administration, the data centre services for the municipalities' specialist applications and the telephone system. The exclusion is justified: these areas have their own owners and will follow in a later cycle, and their transitions to portal operation are described as interfaces in part 2. What 300-1 says about the difference between scope and information domain is on the page on delimiting the information domain.

There was no process map for the process list. The IZM therefore used the simplified business process analysis under Annex 2 and collected the minimum information required there: identifier, name, responsible business unit, short description and key applications.

IdentifierNamebusiness ownerShort description (purpose, result, contribution to objectives)key applications
GP-AReceive and hand over online applicationsHead of Portal Services (R-03)Residents submit applications with supporting documents online; the IZM checks them formally and hands them over to the specialist application of the responsible municipality. Result: complete, unaltered application at the municipality. Contribution: the municipalities' online services under the service agreements CP-01.citizen portal, form builder, handover service
GP-BPay fees onlineHead of Portal Services (R-03)Fees are paid within the application via an external payment service provider; the payment status goes to the municipality with the application. Result: application with confirmed payment status at the municipality; contribution: fulfilling service agreement CP-01.citizen portal, payment interface
GP-CMaintain forms and contentPortal editorial leadThe municipalities' editorial teams maintain forms and texts; the IZM provides the form builder. Result: published, reviewed form; contribution: the municipalities' online services.form builder
GP-DAnswer enquiries about the portalHead of Service DeskThe service desk answers enquiries about the portal from residents and municipalities. Result: answered enquiry; contribution: accessibility of the portal for residents and municipalities.ticketing system, email

GP-C was kept as a separate process even though the forms are used in GP-A. The reason: maintenance has its own participants (the municipalities' editorial teams) and its own result. This separation has consequences in part 2 and part 4, because the form builder appears in both processes.

Protection requirements per business process

Protection requirements were assessed in one session per process with the responsible business unit, the ISB and the data protection officer. The yardstick was the two categories from 300-1 chapter 2.6 and the criteria K1 to K7 from the assessment matrix on the protection requirements determination page. The classification high follows the standard's definition: the impact can be considerable. The standard's damage scenarios served as guidance, not as an exhaustive list.

ProcessConfidentialityIntegrityAvailabilityJustification (fictitious)
GP-Ahigh (K2)high (K6)normal, with reservation OF-01Applications contain supporting documents, some with health information (for example for parking concessions); a leak would seriously affect those concerned and damage trust in all twelve municipalities. Altered applications lead to wrong decisions by the municipalities, which rely on the handover. An outage of up to two working days can be absorbed through deadline extensions and paper applications.
GP-Bnormalhigh (K6)normalPayment data is held by the payment service provider; the IZM receives only the payment status and the amount. An altered status leads to decisions without payment or to duplicate claims.
GP-CnormalnormalnormalForms and texts are public; errors are noticed and corrected by the editorial team. The effect of altered form logic on applications is covered under GP-A.
GP-DnormalnormalnormalEnquiries rarely contain more than contact details; outages can be absorbed by telephone and email.

Open decision OF-01: Three municipalities require in their service agreements that the portal accepts applications again within one working day after a disruption. Portal operations therefore considered "high" to be correct for the availability of GP-A, the Head of Portal Services "normal". Executive management approved "normal", included the recovery target of one working day as security objective Z-03 and earmarked the classification for review in the second cycle. This decision comes back in part 4 and part 5.

Sequence: GP-A and GP-B both have high protection requirements. 300-1 recommends starting with the most important process in the highest category and leaves the choice to top management when there are several processes (chapter 2.6). Executive management chose GP-A for the first cycle, GP-B follows in the second (EV-03). An explicit risk assessment is required for both processes (chapter 2.11). How the classification works methodically is shown on the page Protection requirements determination.

Policy, roles and document control

The policy LL-01 describes objectives and strategy and sets out the commitment of executive management, as chapter 2.7 provides. The standard mentions measurable objectives, for example according to SMART. The IZM formulated three objectives against which the metrics in part 4 can be measured: Z-01, for every requirement in the requirements package there is an implementation status no more than three months old; Z-02, critical vulnerabilities on portal assets are remedied within seven days; Z-03, after a disruption the portal accepts applications again within one working day, measured as no more than 24 hours from the start of recovery. Executive management approved the policy, and the intranet and a briefing made it known to all employees.

One finding on the roles remained open. The ISB is also deputy head of IT operations. Chapter 2.8 explicitly names the combination of IT management and ISB as an example of a conflict of interest to be avoided, and catalogue requirement GC.9.1.1.1 provides for responsibility for information security to be assigned to a person who reports directly to top management; the parameter proposes „einer unabhängigen Person“ (our translation: "an independent person") for this. GC.9.1.1.3 requires safeguards against conflicts of interest. The guidance on GC.9.1.1.3 names, among other solutions, setting up the ISB as a staff unit or a four-eyes principle.

RoleTask in the ISMSStaffing in the case (fictitious)Finding
R-01 Executive managementoverall responsibility, approvals under ch. 2.10, approval of residual risksManaging director and deputy-
R-02 ISBsteering the security process, moderating the risk assessmentpart-time ISB, also deputy head of IT operationsconflict of interest, GC.9.1.1.1 and GC.9.1.1.3 not fulfilled; solution deferred in EV-04
R-03 Head of Portal Servicesowner of GP-A and GP-B, risk ownerHead of the Portal Services division-
R-04 IT operationsoperation of the systems, operational implementationdata centre team, six administrators in portal operation-
R-05 Data protection officerconsultation, no ISB tasksinternal DPOseparate from the ISB, as ch. 2.8 suggests
R-06 Audit teaminternal audit (from part 4)internal audit department of a member municipality on behalf of the IZMmandate included in EV-04
R-07 Contract managementcontracts with municipalities, manufacturer and payment service providerLegal and Contracts staff unitL-01 open
R-08 Editorial leadbusiness responsibility for GP-Ceditorial lead in portal operation-

Involvement of the ISB: Chapter 2.8 requires the ISB to be involved in security-relevant projects and that it be defined when this happens. The IZM has defined: the ISB is informed of every change that concerns a new interface, a new asset or a new service provider, and is involved before every go-live.

Document control DL-01: All documents of the case file are kept in a repository with version, approving role and review date. This is the basis for the procedure under chapter 2.9 and for traceability in the audit.

Communication rule KR-01: defines who communicates on security matters internally and towards municipalities, the manufacturer and the public, and through which channel, including the reports to the association assembly and the reporting channel to the municipalities.

Framework for the risk assessment

Because GP-A and GP-B have high protection requirements, the IZM needs an explicit risk assessment. Chapter 2.11 requires the framework for it as early as the first process step, at strategic, methodological and organisational level, and has it authorised by top management. The method can be chosen freely as long as the minimum criteria (Mindestkriterien) from Annex 3 are met. The IZM chose a simple scenario-based method with three levels. The scales and the matrix are the case's own definitions, not a BSI requirement. The IZM set the parameter of RISK.1.1 („nach einem anerkannten Standard“, our translation: "according to a recognised standard") as "based on ISO/IEC 27005, in compliance with the minimum criteria from Annex 3"; 300-1 chapter 2.11 names ISO/IEC 27005 and ISO 31000 as possible bases.

LevelIZM definition (fictitious)Minimum criterion (Annex 3)
strategicLow risk appetite for confidentiality and integrity of application data; delays of up to two working days acceptable. Acceptance criteria: "low" acceptable; "medium" acceptable for a limited period, at most twelve months; "high" to be treated, otherwise only as an exception by executive management7, 8, 27, 28
methodologicalrisk scenarios based on the elementary threats G 0.1 to G 0.47; likelihood rare (less often than every five years), occasional (every one to five years), recurring (at least annually); impact limited, considerable, existential1 to 4, 6, 10, 18, 19
organisationalthe risk owner is the owner of the business process (for GP-A the Head of Portal Services R-03); the ISB moderates and keeps the risk register5, 16
Authorisationrisk policy, roles, criteria and risk appetite signed by executive management (EV-06)9
Likelihoodlimitedconsiderableexistential
rarelowmediumhigh
occasionallowhighhigh
recurringmediumhighhigh

Whether your own method covers all 35 criteria can be checked with the checklist on the page Risk minimum criteria. How a risk assessment works is shown on the page Risk analysis. The IZM's own risks are in part 3.

Decision papers for executive management

Under chapter 2.10, responsibility for the ISMS lies with top management and cannot be delegated. In chapter 2.10, 300-1 lists the decision papers that are submitted to it in particular: scope, protection requirements of the business processes, sequence of the processes, resources and policy. The list is not exhaustive; the IZM added the risk framework as a sixth paper.

PaperSubjectResult in PM 3 (fictitious)
EV-01Scope Portal Services with exclusionsadopted
EV-02Protection requirements GP-A to GP-Dadopted, availability of GP-A with reservation OF-01
EV-03Sequence: GP-A in the first cycle, then GP-B, GP-C, GP-Dadopted
EV-04Resources: ISB as a full-time staff unit, mandate for the audit teamaudit team mandate adopted; ISB post deferred until the association assembly's budget resolution
EV-05Policy LL-01 with objectives Z-01 to Z-03adopted
EV-06Framework of the risk assessmentadopted

The deferral of EV-04 is the most important open point of part 1. It leaves the ISB's conflict of interest in place. For a MUSS (MUST) requirement such as GC.9.1.1.1 there is no way out through risk acceptance (chapter 4.1.2); the question returns in part 3 as an unfulfilled MUSS requirement with a safeguard and deadline.

Result of part 1: methodology status after the first step

The methodology requirements of the user catalogue apply to every information domain (300-1 chapter 3.4.1). The IZM recorded their status at the end of step 1, as a provisional list that feeds into the full status survey in part 3. The requirement texts are shortened, and the identifiers come from the build of 29 October 2026.

Requirement (modal verb)Content, shortenedStatus PM 3 (fictitious)Evidence in the file
GC.2.1, GC.2.2 (MUSS)analyse external and internal conditionsfulfilledKX-01 to KX-04
GC.3.1 (MUSS)establish a procedure for recording compliance obligationsfulfilledcompliance list CP-01 to CP-04
GC.3.1.1 (MUSS)analyse legal obligationsnot fulfilled until OF-02 is answeredrequest to the legal department
GC.3.1.3 (SOLLTE, SHOULD)analyse contractual obligationsnot fulfilled, temporarily (L-01)list of missing contracts
GC.4.1, GC.4.2 (MUSS)analyse external and internal interested partiesfulfilledIP-01 to IP-04
GC.5.1 to GC.5.1.4 (MUSS)objectives, strategy, top management commitment, policy and its approvalfulfilledLL-01, EV-05
GC.6.1 (MUSS)define a delimited scope after approval by top managementfulfilledEV-01
GC.7.1, GC.7.1.1, GC.7.1.2 (MUSS)procedure, business processes, protection requirementsfulfilledprocess list, EV-02
GC.7.2 (MUSS)carry out a risk assessment for processes with high protection requirementsnot fulfilled, planned for step 3-
GC.8.1 (MUSS)establish a procedure for resource planningnot fulfilledEV-04 deferred
GC.9.1, GC.9.1.1 (MUSS)security organisation, roles and responsibilitiesfulfilledrole table R-01 to R-08
GC.9.1.1.1, GC.9.1.1.3 (MUSS)independent ISB reporting directly to top management; avoid conflicts of interestnot fulfilledfinding on R-02
GC.10.1, GC.10.1.2 (MUSS)communication management; involvement in security-relevant projectsfulfilledcommunication rule KR-01; rule on ISB involvement
GC.11.1 (MUSS)document control across the life cyclefulfilledDL-01
GC.12.1, RISK.1.1, RISK.1.3, RISK.1.5 (MUSS)uniform risk methodology, risk owner role, approval by top managementfulfilledrisk policy, EV-06

Open at the end of part 1:

  • OF-01 availability of GP-A: normal with reservation, review in the second cycle
  • OF-02 state-law requirements: with the legal department
  • L-01 missing service agreements K07 and K11
  • EV-04 ISB post deferred, conflict of interest persists

These points do not stand in the way of part 2. 300-1 does not require step 1 to be completely fulfilled before the requirements analysis begins. They must, however, end up in the implementation plan, otherwise they disappear.

What comes next

In part 2 the IZM defines the information domain for GP-A, records the assets with their dependencies, assigns them to target object categories (Zielobjektkategorien) and recalculates the requirements package from the catalogue build.

Blackfort Technology supports the survey and prepares decision papers for top management, see Consulting.

Rights notice: Short quotations and references from BSI Standard 300-1 "Methodik Grundschutz++", version 1.0 of 20 October 2026, © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI page on Grundschutz++. They are not licensed under CC BY-SA 4.0; the licence notice at the end of the page applies only to the extracts from the catalogue data.

Frequently asked questions

Is there an example of how Grundschutz++ is applied?
This case file shows all five process steps of BSI Standard 300-1 for a fictitious municipal IT service provider, with real identifiers from the user catalogue (build 2026-10-29). In its milestone plan the BSI has announced its own application example for December 2026, based on the fictitious example authority "BDIT".
Which decisions does top management have to take in the first process step?
Under 300-1 chapter 2.10, it is in particular presented with papers on the scope, the protection requirements of the business processes, the sequence of the processes, resources and the policy. It authorises the framework of the risk assessment under chapter 2.11.
Can you start with Grundschutz++ while gaps in the first step are still open?
300-1 does not require step 1 to be completely fulfilled before the requirements analysis begins. Open methodology requirements are requirements in the package like any other: their status is recorded, and safeguards must be defined for unfulfilled MUSS (MUST) requirements (chapter 4.1.2).
May the ISB also be part of IT management?
In chapter 2.8, 300-1 names IT management and ISB as an example of a conflict of interest to be avoided. Catalogue requirement GC.9.1.1.1 requires an ISB reporting directly to top management, its parameter names an independent person, and GC.9.1.1.3 requires safeguards against conflicts of interest. In the case this is therefore an unfulfilled MUSS requirement.

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859 of 2026-10-30)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.