Grundschutz++ example, part 3: implementation with status, risks and implementation plan

Part 3 of this Grundschutz++ example shows the implementation phase at the fictitious IT Special-Purpose Association Sample Region (IT-Zweckverband Musterregion, IZM): for all 930 entries of the requirements package the implementation status is surveyed, every requirement that is not fulfilled is classified by its modal verb, and the risk assessment is carried out for process GP-A. The result is the status balance, a risk register with four risks and two residual risks, and the implementation plan with responsibilities, deadlines and evidence. The page also shows which proposals for "not applicable" were rejected and which decision executive management was not allowed to take.

Corridor in the same building during installation work, parquet floor covered with cardboard, wooden ladder, cable drum, toolbox and work light, a new cable tray on the ceiling, at the end an arched window facing the courtyard

Note and recap of parts 1 and 2

Fictitious case. Organisation, systems, status values, risks and decisions are invented. The case file has not been reviewed by the Bundesamt für Sicherheit in der Informationstechnik (BSI), the German Federal Office for Information Security, is not certified and cannot be transferred to real municipalities or service providers. What is real are the identifiers, modal verbs and threat mappings of the requirements from the Grundschutz++ user catalogue (Anwenderkatalog), build 2026-10-29; methodology according to BSI Standard 300-1, version 1.0.

The story so far: The IT Special-Purpose Association Sample Region (IZM) runs a citizen portal for twelve municipalities. In part 1 executive management selected process GP-A "Receive and hand over online applications", with high protection requirements for confidentiality and integrity, for the first cycle and authorised a risk framework with three levels (low, medium, high). The information security officer (ISB) post remained deferred (EV-04). In part 2 a package of 928 catalogue requirements and two own requirements (EIG-01 on the approval of form logic, EIG-02 on the signature of handed-over applications) was compiled for the information domain IV-PORTAL with 24 assets. The form builder AS-02 is considered not sufficiently covered. The data backup is located in the same server room as the systems (finding B-01).

Between part 2 and part 3 the legal department examined open question OF-02 and entered its result in the compliance list. GC.3.1.1 is therefore fulfilled.

How the IZM surveyed the status

Chapter 4.1.1 requires the status of every requirement to be checked completely, with the values fulfilled, not fulfilled or not applicable. The IZM surveyed the 930 entries between PM 5 and PM 7, using the methods named in chapter 4.1: interviews with the teams, review of documents, analysis of configuration exports and existing reports from tools. Each line of the status list NW-02 contains the date of the check, the person checking and the reference to the evidence. The list thus also provides evidence for UMS.1.1, which requires a complete review at the defined interval, here quarterly.

For requirements that apply to several assets, a simple rule applied: fulfilled only if fulfilled on every affected asset. The guidance on UMS.1.1 points in the same direction. It only treats a requirement as implemented once all requirements that depend on it are implemented as well. How the three statuses are assigned in general, and where the catalogue says something different, is explained on the page Assessing requirements and documenting deviations.

Status balance by modal verb

The figures are fictitious, but together they add up exactly to the package from part 2. The two SOLLTE (SHOULD) requirements with level "elevated (erhöht)" (DET.4.12.1, REA.2.5) and the two own requirements are included in the SOLLTE row.

Modal verbin packagefulfillednot fulfillednot applicableConsequence under 300-1 ch. 4.1.2
MUSS (MUST)149117275define safeguards for every requirement not fulfilled; no exception, no risk acceptance
SOLLTE (SHOULD)57848065 (63 temporary, 2 permanent)33temporary: justify and schedule; permanent: risk assessment
KANN (MAY)203381641optional; can be selected in risk treatment
Total93063525639

Among the 27 MUSS requirements not fulfilled are 21 methodology requirements of the practices (Praktiken) monitoring and evaluation (Monitoring-Evaluation, PERF, 13) and improvement (Verbesserung, VRB, 8). At this stage that is consistent: audit, management review and corrective procedures belong to steps 4 and 5, which have not yet been carried out. The remaining six are GC.1.1 (establishing and maintaining the ISMS; according to the guidance only fulfilled once the approach has been run through completely at least once), GC.8.1 (resource planning), GC.9.1.1.1 and GC.9.1.1.3 (independent ISB, conflicts of interest), TEST.1.1 (change procedure, which so far does not cover the form logic) and NOT.1.1 (outdated rules on emergency preparedness).

Status examples from the list, with justification

The following selection shows every kind of entry that occurs in the case file, including several entries that turn out to be wrong in the audit in part 4 (BER.3.16 to BER.3.19, KONF.8.1, NOT.4.16.1). The requirement texts are shortened. Identifier, modal verb and target object category (Zielobjektkategorie) are taken from the build.

Requirement (modal verb, category)StatusJustification and evidence (fictitious)
GC.9.1.1.1 independent ISB, reporting directly to top management (MUSS, none)not fulfilledThe ISB is also deputy head of IT operations. Safeguard MN-01, deadline PM 9. A proposal from executive management to accept the risk until the next budget was rejected: for MUSS requirements, exception and risk acceptance are not possible under ch. 4.1.2.
PERF.3.1 establish a procedure for audit programmes (MUSS, none)not fulfilled, scheduledaudit programme is drawn up in part 4; MN-12, deadlines PM 9 (audit programme) to PM 11 (first audit)
GC.7.2 risk assessment for processes with high protection requirements (MUSS, none)fulfilled for IV-PORTAL (GP-A)risk register with RR-01 and RR-02 for GP-A, see below; the risk assessment for GP-B follows with its modelling in the second cycle (EV-03)
BER.3.16 prohibit group accounts in regular operation (SOLLTE, none)fulfilledNW-05: account export from the directory service AS-13 without group accounts
BER.3.17, BER.3.18, BER.3.19 rules for group accounts (SOLLTE, none)not applicableno group accounts exist, the underlying component does not exist (ch. 4.1.1); the guidance on BER.3.17 and BER.3.18 calls the requirement dispensable in this case
DEV.1.1 procedure for developing IT products (MUSS, none) and 33 further requirements of the DEV practicenot applicableThe IZM does not develop IT products within the information domain, the portal was procured. In this case the guidance on DEV.1.1 calls the whole practice dispensable.
KONF.3.3 SIM PIN for mobile network connection (SOLLTE, IT systems)not applicableno IT system in the information domain has a mobile network connection
NOT.4.5 archiving of data needed in the long term (SOLLTE, data)not applicableapplication data is deleted 90 days after handover; the guidance calls the requirement dispensable if no data is needed in the long term
KONF.11.4 block trial-and-error guessing of access links (SOLLTE, web applications)fulfilledProposal "not applicable because everyone logs in" rejected: the application status can be retrieved by case number without logging in, and the guidance calls the requirement dispensable only if the web application offers no access whatsoever to information worth protecting without authentication; the application status linked to a case is such information. NW-09: configuration export of the reverse proxy
KONF.12.10 activate cookie attributes (SOLLTE, web applications)not fulfilled, temporaryone attribute is missing in the session cookie, fixed with the manufacturer's update in PM 10; MN-07; residual risk RS-02
KONF.8.1 monitor the availability of security updates (SOLLTE, IT systems)fulfilledNW-11: automated report from software distribution with tool, time and result "41 of 41 recorded systems without open critical updates"
NOT.4.16.1 check restoration using random samples (SOLLTE, data)fulfilledNW-14: test record from PM 4 with three samples
BER.5.9 multi-factor authentication for far-reaching permissions (SOLLTE, none)not fulfilled, temporaryadministrators have MFA; the editorial teams who can publish form logic do not yet; MN-21, deadline PM 11
GEB.1.4 place assets worth protecting outside exposed areas (SOLLTE, locations)not fulfilled, permanentserver room RZ-1 in the basement by the river (KX-01); a move is not planned for the foreseeable future; risk assessment RR-03
TEST.3.1.5 install a dedicated test environment (SOLLTE, none)not fulfilled, permanentThe citizen portal licence does not include a test instance until the end of the contract; risk assessment RR-04
BER.4.1.2 JIT/JEA permissions (KANN, none) and DET.6.2.1 sandbox analysis of suspicious files (KANN, none)not fulfilledselected in the risk treatment of RR-01, MN-53 and MN-54
EIG-01 approval of form logic by an independent role (SOLLTE, own requirement)not fulfilled, temporaryMN-55, deadline PM 9

For "not applicable" the IZM only allowed the two reasons from chapter 4.1.1: the underlying component does not exist in the information domain, or the requirement cannot be fulfilled functionally. Lack of relevance does not count. In total the teams submitted 47 proposals for "not applicable". 39 were accepted with a justification, eight were rejected and entered as fulfilled or not fulfilled, among them KONF.11.4. Which of the 39 justifications hold up is checked by the internal audit in part 4.

Temporarily unfulfilled SOLLTE requirements: an open question of interpretation

For the 63 temporarily unfulfilled SOLLTE requirements the standard says different things in two places. Chapter 4.1.2: „Eine temporäre Nichterfüllung löst keine Risikobetrachtung aus.“ (our translation: "Temporary non-fulfilment does not trigger a risk assessment.") Chapter 2.11: „Für SOLLTE-Anforderungen, die in der Umsetzungsplanung enthalten, aber noch nicht erfüllt sind, muss eine Restrisikobetrachtung durchgeführt werden.“ (our translation: "For SOLLTE requirements that are included in the implementation planning but not yet fulfilled, a residual risk assessment must be carried out.") Chapter 4.1.1 additionally requires the risk not yet mitigated to be identified and communicated to top management. How the two fit together is open.

The IZM chose the more cautious route. The guidance on the catalogue requirement UMS.1.2 allows the risks of requirements not implemented to be consolidated so that top management can follow them. The ISB therefore formed a joint residual risk RS-01 for the remaining 62 entries, with the latest deadline as its end, and kept KONF.12.10 separately as RS-02, because it affects the confidentiality of GP-A. Executive management approved both. Chapter 4.1.1 is not limited to SOLLTE requirements. The IZM therefore also informed executive management of the existing risk of the 27 scheduled MUSS requirements, as part of decision paper EV-07. This is not an acceptance: for these requirements safeguards and deadlines remain mandatory (chapter 4.1.2).

Risk register for GP-A

All three triggers for an explicit risk assessment from chapter 2.11 occur in the case: high protection requirements of GP-A, the asset AS-02 that is not sufficiently covered, and two permanently unfulfilled SOLLTE requirements. The residual risk assessment for scheduled SOLLTE requirements not yet fulfilled is in the previous section (RS-01, RS-02). The assessment used the matrix from part 1. With high protection requirements the IZM first identifies risks at process level and adds critical assets (chapter 4.2.1). For the permanently unfulfilled requirements the elementary threats from the catalogue are taken into account, as criterion 17 requires. The columns cover the minimum information under criterion 15.

ItemRR-01RR-02RR-03RR-04
Triggerhigh protection requirements GP-Ahigh protection requirements GP-A; AS-02 not sufficiently coveredGEB.1.4 permanently not fulfilledTEST.3.1.5 permanently not fulfilled
Object of analysisGP-A; critical AS-01, AS-19GP-A; critical AS-02, AS-20AS-17, AS-16; affects GP-A to GP-DAS-01, AS-02
DescriptionUnauthorised access to application data and supporting documents via vulnerabilities of the portal, uploaded malware or misused administration accountsManipulated or faulty form logic corrupts application data that reaches the municipalities unnoticedWater ingress in the basement destroys systems and backups at the same time (B-01)Updates and changes go into operation untested and cause malfunctions
Elementary threatsG 0.19, G 0.23, G 0.28, G 0.32, G 0.39G 0.21, G 0.22, G 0.31per catalogue for GEB.1.4: G 0.5, G 0.6, G 0.7, G 0.18; added by the IZM: G 0.3 Waterper catalogue for TEST.3.1.5: G 0.28, G 0.18
Protection goalsconfidentialityintegrityavailability, integrityintegrity, availability
Risk ownerR-03R-03R-03 lead for GP-A to GP-D (ch. 4.2.1)R-03
Assessment beforeoccasional, considerable: highoccasional, considerable: highrare, existential: highoccasional, limited: low
Priority1123
Treatment optionreductionreductionreductionacceptance
SafeguardsMN-53 (BER.4.1.2), MN-54 (DET.6.2.1), MN-58 (TEST.3.1.11)MN-55 (EIG-01), MN-56 (TEST.4.1.1), MN-21 brought forward (BER.5.9)MN-59 copy of the backup at K05 (own safeguard), MN-60 flood protection (own safeguard)-
Assessment afterrare, considerable: mediumrare, considerable: mediumrare, considerable: mediumlow
Decisionaccepted for a limited period, twelve monthsaccepted for a limited period, twelve monthsaccepted for a limited period, twelve months; move open (OF-05)accepted

The safeguards come first from the KANN requirements with level "elevated (erhöht)" that 300-1 provides for this (chapter 3.4.2): BER.4.1.2 (rights only at the time of access, here for administration access to AS-07 and AS-13), DET.6.2.1 (test suspicious uploaded files in an isolated environment), TEST.3.1.11 (test known vulnerabilities for critical changes), TEST.4.1.1 (have critical changes also authorised by an independent person). The IZM examined NOT.4.12 (keep a copy of the data backup geo-redundantly) but did not select it: the guidance generally understands geo-redundant as 200 km or more in a straight line, and no data centre that far away was available. Where the catalogue contained nothing suitable or it could not be implemented, the own requirement EIG-01 and two own safeguards were added.

Approvals: Executive management authorised the residual risks of RR-01 to RR-04 (criterion 30), those accepted for a limited period with an expiry date (criterion 28). The risk owner R-03 approved the implementation planning of the safeguards (chapter 4.2.3, criterion 31). Because the first three risks were initially "high", that is outside the acceptance criteria, assessment and treatment were carried out again after the safeguards (criterion 26). The review takes place at least annually and after significant changes (criterion 35).

Open decision OF-05: Moving the server room to an upper floor would make GEB.1.4 achievable. Executive management commissioned a feasibility study but has decided nothing. Until then GEB.1.4 remains permanently not fulfilled. How a risk assessment works in detail is shown on the page Risk analysis.

Status balance of the fictitious case as stacked bars per modal verb: MUSS 149 with 117 fulfilled, 27 not fulfilled, 5 not applicable; SOLLTE 578 with 480 fulfilled, 63 temporarily and 2 permanently not fulfilled, 33 not applicable; KANN 203 with 38 fulfilled, 164 not fulfilled, 1 not applicable. Arrows lead from the bars to the consequences: safeguards without exception for MUSS, implementation plan and residual risk for temporary, risk register RR-03 and RR-04 for permanent, selection for risk treatment for KANN.
Status balance and consequences under BSI Standard 300-1 chapters 4.1.1 and 4.1.2. Fictitious values, package scope from the user catalogue build 2026-10-29, own illustration, as of 1 November 2026.

Implementation plan: extract with responsibility, deadline and evidence

The implementation plan contains 60 safeguards: MN-01 to MN-52 for the scheduled MUSS and SOLLTE requirements and MN-53 to MN-60 from risk treatment; together they cover all 90 scheduled requirements (27 MUSS, 63 SOLLTE temporary). Some safeguards from risk treatment also address scheduled requirements, for example MN-55 for EIG-01 and TEST.1.1. Chapter 4.3 requires each safeguard to be linked to the requirements it addresses and at least the requirement, the date of implementation or review and the person documenting or checking to be recorded. The IZM prioritised by level of risk, by dependencies and, as chapter 4.3 recommends, with precedence for requirements of the parent nodes. The plan is kept in the ticket system of IT operations (chapter 4.4).

Safeguard (fictitious)addressesresponsible (business / operational)DeadlineEvidencechecked by
MN-01 set up the ISB as a staff unit of executive managementGC.9.1.1.1, GC.9.1.1.3R-01 / HR departmentPM 9organisation chart, appointmentaudit team R-06
MN-07 deliver the session cookie with all attributesKONF.12.10R-03 / IT operations R-04PM 10scan report with tool, time, resultISB
MN-12 draw up the audit programme and carry out the first internal auditPERF.3.1, PERF.3.1.1 to PERF.3.1.4, PERF.3.2R-01 / audit team R-06PM 9 to PM 11audit programme, audit reportexecutive management
MN-21 MFA for editorial accountsBER.5.9; brought forward for RR-02R-08 / IT operationsPM 9 instead of PM 11configuration export of the portalISB
MN-53 administration rights for AS-07 and AS-13 only on request and time-limitedBER.4.1.2; RR-01R-04 / identity teamPM 10log of rights assignmentsISB
MN-54 sandbox check of suspicious uploadsDET.6.2.1; RR-01R-04 / IT operationsPM 11configuration, test report with prepared fileISB
MN-55 approval of form logic by the IZM's editorial lead before publicationEIG-01; TEST.1.1; RR-02R-08 / editorial leadPM 9approval record in the form builderISB
MN-59 daily copy of the data backup to the data centre of municipality K05 outside the flood zoneRR-03 (own safeguard; NOT.4.12 remains not fulfilled because the distance is below the 200 km named in the guidance)R-03 / IT operationsPM 11backup log, agreement with the municipalityISB
MN-60 mobile flood barriers and water detectors in the basementRR-03 (own safeguard)R-03 / building servicesPM 10acceptance record, alarm testISB

MN-59 creates a new interface to the municipality whose data centre receives the copy. Under the rules from part 1 this is a case for involving the ISB and a change in the information domain that is taken into account in the validation in part 4. How evidence is planned per safeguard is described on the page Evidence plan.

Approval and progress: Executive management approved the plan with EV-07, because it provides the resources (chapter 4.4), and decided on the ISB staff unit for PM 9. Until then progress is tracked by the controlling staff unit and not by the ISB, because as deputy head of IT operations he implements many safeguards himself. This avoids the conflict of interest between implementation and progress tracking that chapter 4.5 aims to rule out. The status report goes to executive management monthly.

Result of part 3 and open items

At the end of PM 8 three documents are available: the status list NW-02 with 930 entries and justifications, the risk register with RR-01 to RR-04 and the residual risks RS-01 and RS-02, and the approved implementation plan with 60 safeguards. For GP-A there is now, for the first time, evidence of which requirements are fulfilled and who will fulfil the others by when.

Open at the end of part 3:

  • OF-01 availability of GP-A, review in the second cycle
  • OF-03 login service as an interface instead of an asset
  • OF-04 coverage of the form builder, still disputed by portal operations
  • OF-05 moving the server room
  • L-01 service agreements K07 and K11 still outstanding (GC.3.1.3 temporarily not fulfilled)
  • Question of interpretation chapters 2.11 and 4.1.2 on temporary non-fulfilment, resolved cautiously via RS-01

Whether the status list is correct only becomes clear during the review. In part 4 the internal audit checks samples, including entries listed here as fulfilled or not applicable.

What comes next

In part 4 the IZM measures its objectives with its own metrics, has the first internal audit carried out, evaluates the monitoring procedures and presents the management review to executive management.

Blackfort Technology supports status surveys, risk assessment and implementation planning, see Consulting.

Rights notice: Short quotations and references from BSI Standard 300-1 „Methodik Grundschutz++“ (Grundschutz++ methodology), version 1.0 of 20 October 2026, © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI page on Grundschutz++. They are not licensed under CC BY-SA 4.0. The licence notice at the end of the page applies only to the extracts from the catalogue data.

Frequently asked questions

When may a Grundschutz++ requirement be treated as not applicable?
Under BSI Standard 300-1 chapter 4.1.1 only if the underlying component does not exist in the information domain or the requirement cannot be fulfilled functionally. A justification must be documented for every requirement that is not applicable. Lack of relevance is not a reason.
Can top management accept a MUSS requirement that is not fulfilled?
No. For MUSS (MUST) requirements that are not fulfilled, safeguards to fulfil them must be defined; a risk assessment does not replace fulfilment, and an exception or risk acceptance is not possible (300-1 chapter 4.1.2).
Does a temporarily unfulfilled SOLLTE requirement need a risk assessment?
The standard is not clear on this point. Chapter 4.1.2 says that temporary non-fulfilment does not trigger a risk assessment; chapter 2.11 requires a residual risk assessment with approval by top management for scheduled SOLLTE (SHOULD) requirements not yet fulfilled. In the case the residual risk is recorded in consolidated form and approved.
What must an implementation plan contain under Grundschutz++?
Specific safeguards per requirement with an unambiguous assignment, a prioritisation, responsibilities and deadlines, and for each safeguard at least the requirement, the date of implementation or review and the person documenting or checking; evidence must be assigned to the safeguard (300-1 chapters 4.3 and 4.4).

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859 of 2026-10-30)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

  • Identifiers, titles, modal verbs, target object categories and threat mappings as well as shortened requirement texts of GC.1.1, GC.7.2, GC.8.1, GC.9.1.1.1, GC.9.1.1.3, TEST.1.1, NOT.1.1, PERF.3.1, UMS.1.1, UMS.1.2, BER.3.16 to BER.3.19, BER.4.1.2, BER.5.9, DEV.1.1, KONF.3.3, KONF.8.1, KONF.11.4, KONF.12.10, NOT.4.5, NOT.4.12, NOT.4.16.1, GEB.1.4, TEST.3.1.5, TEST.3.1.11, TEST.4.1.1, DET.6.2 and DET.6.2.1; paraphrased guidance on GC.1.1, UMS.1.1, UMS.1.2, BER.3.17, BER.3.18, DEV.1.1, NOT.4.5 and KONF.11.4: BSI State-of-the-Art Library, Grundschutz++ user catalogue (build 2026-10-29, commit c3f37859 of 2026-10-30), retrieved 2026-11-01. Shortened, translated or edited by Blackfort Technology.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.