Grundschutz++ example, part 5: improvement and completion of the first cycle

Part 5 of this Grundschutz++ example shows continual improvement at the fictitious IT Special-Purpose Association Sample Region (IT-Zweckverband Musterregion, IZM): it analyses six nonconformities from the audit and the metrics for their causes, assesses improvement potentials, draws up the corrective and improvement plan and checks whether the corrections work. The result is the final balance of the first cycle for 944 entries, with one correction that missed its objective and with the list of points that go into the second cycle. At the end comes the question of when a cycle has been run through in full in the sense of the catalogue.

Inner courtyard of the brick building at dusk with a large lime tree, windows lit warmly, a section of the façade with arched windows under scaffolding

Note and recap of parts 1 to 4

Fictitious case. The organisation, nonconformities, safeguards, measurements and decisions are invented. The case file has not been reviewed by the BSI (Bundesamt für Sicherheit in der Informationstechnik, the German Federal Office for Information Security), is not certified and cannot be transferred to real municipalities or service providers. What is real are the identifiers and texts of the requirements from the Grundschutz++ user catalogue (Anwenderkatalog), build 2026-10-29; methodology according to BSI Standard 300-1, version 1.0.

The story so far: For the portal process GP-A, the IT Special-Purpose Association Sample Region (IZM) surveyed context, protection requirements and roles (part 1), compiled a package of 930 entries (part 2), surveyed the status, treated four risks and planned 60 safeguards (part 3). The internal audit in part 4 produced eight findings, among them a group account that was believed not to exist (FS-01), an incomplete backup with a recovery time of 31 hours (FS-02), a patch report missing five systems (FS-03) and two target object categories (Zielobjektkategorien) wrongly left empty (FS-05). In MB-01, executive management commissioned the corrective and improvement plan (EV-08) and decided to apply the practice (Praktik) DEV to the form logic (EV-09).

Nonconformities and their causes

Under chapter 6.1, a deviation exists where requirements are not fulfilled to the intended extent. The standard requires deviations to be recorded and examined systematically: immediate and underlying causes, likelihood and consequences of recurrence, similar cases in other areas and indications of systemic weaknesses. In the catalogue, VRB.2.1 requires a method for this; its guidance explicitly names root cause analysis that goes beyond the immediate cause. From the audit findings and the missed metric KZ-04, the IZM formed six nonconformities.

NKimmediate causeunderlying causerecurrencesimilar cases (cross-check)systemic
NK-01 group account (FS-01)local account created by the manufacturer at commissioning and kept in usestatus for BER was based only on the export from the directory service; local accounts are not listed in the inventory of authorisations (BER.1.4)likely for every device with its own account managementcomparison of all 46 systems: two further local accounts on the firewall clusteryes, SW-1
NK-02 backup incomplete (FS-02)a directory excluded after the backup job was changed overchange to the backup job without a change procedure and without comparison against the list of data to be backed up (NOT.4.1); test samples not selected by riskpossible with every change to the jobbackup of the form builder checked: completeyes, SW-2
NK-03 patch report incomplete (FS-03)five virtual machines without an agenttool report accepted as evidence without reconciling the population against the CMDBlikely with every new VMantivirus report: three systems were missing there as wellyes, SW-2
NK-04 categories wrongly empty (FS-05)information from IT operations adopted without checkingcompleteness check in part 2 only through interviews, without observation at the workplacepossible with every extension of the information domainservice desk AS-21 also uses browser and office software; the categories are already in the package with AS-25, and the status of the 14 requirements is surveyed for AS-21 as wellyes, SW-2
NK-05 deadline for the information security officer (ISB) exceeded (FS-07)recruitment procedure took longer than planneddeadline set without consulting the HR department; ch. 4.4 requires realistic deadlines and coordination with the units concernedlikely for safeguards that need staffKZ-02 shows 72% deadline compliance overallyes, SW-3
NK-06 objective Z-03 missed (KZ-04, EV-12)recovery in 31 hoursrecovery never measured against Z-03; restart time not plannedcertain as long as the technology does not change-no, technical

Three systemic weaknesses. SW-1: inventories contain only centrally managed objects. SW-2: the statuses "fulfilled" and "not applicable" were adopted on the basis of the teams' self-reporting, without a cross-check by another role. This touches on PERS.2.3.3, which requires a separation of roles between implementing security requirements and reviewing them. SW-3: deadlines are set without the units that have to meet them. Under chapter 6.1 it must be examined whether such weaknesses require fundamental adjustments to the ISMS. For SW-2 the IZM answered yes and changed the procedure for the status survey (KV-05).

Improvement potentials and their assessment

Besides the deviations, the IZM evaluated the sources that chapter 6.2 names for improvement potentials: threat situation, effectiveness of the implementation plan, audit results, process optimisations, security incidents and suggestions from employees. The assessment followed the five criteria of the standard, on three levels.

VPSourceProposal (fictitious)Risk reductionEffortStrategic importanceSynergiesSustainability
VP-01security event SV-01complete MFA for all 24 editorial accounts (BER.5.9)highlowhighRR-02high
VP-02effectiveness of the implementation plan, FS-06requirement identifier as a mandatory field in the ticketing systemlowlowmediumevidence, audithigh
VP-03audit result FS-08vulnerability findings on portal assets with a reference to the affected risk in the registermediumlowmediumRR-01medium
VP-04process optimisation, KZ-05more automated evidence, each reconciled against the population from the CMDBmediummediumhighSW-2high
VP-05suggestion from the service deskenquiries about fake emails in the portal's name: bring forward a strict sender policy for sending notifications (KONF.13.5.1, so far scheduled in the plan for PM 16)mediumlowmediumAS-15high

Corrective and improvement plan

Chapter 6.3 requires the proposals to be embedded in a corrective and improvement plan, prioritised by available resources, quick wins and greatest improvement potential, and the plan to be included in the implementation plan. In the catalogue, VRB.4.1 (corrective actions), VRB.4.2 (improvement actions) and VRB.5.1 (priorities) cover this. Every entry has a measurable effectiveness criterion, because chapter 6.4 provides for clear, measurable criteria for the evaluation. Entries KV-01 to KV-10 are in the implementation plan as MN-61 to MN-70.

EntryforSafeguard (fictitious)PriorityresponsibleDeadlineEffectiveness criterion
KV-01NK-01dissolve all locally shared accounts; one emergency account per system as a documented exception with justification, protection and attribution of every use to a person, as described in the guidance on BER.3.16; add local accounts to the inventory under BER.1.4quick winR-04PM 13comparison of all systems: no shared account in regular operation
KV-02NK-02, NK-06correct the backup job, reconcile the list of data to be backed up automatically with the job, recovery test with risk-based samples including the evidence directorygreatest potentialR-03 / R-04PM 14100% of samples complete; acceptance of applications within one working day, defined under Z-03 as no more than 24 hours
KV-03NK-03agents on the five VMs; every tool report shows its coverage against the CMDBquick winR-04PM 13coverage 46 of 46 in three consecutive reports
KV-04NK-04add asset AS-25 "browser and office software on the admin notebooks" with the categories Web browsers and Office applications, survey the status of the 14 requirements; future completeness checks with observation at the workplacequick winISBPM 1314 entries with status; no empty category without evidence at the next validation
KV-05SW-2cross-check by the ISB staff unit of every status "not applicable" and every status "fulfilled" that rests only on self-reporting (PERS.2.3.3)greatest potentialISBPM 15all 39 former "not applicable" entries and all self-reports given a second review
KV-06NK-05, SW-3deadlines only after agreement with the unit responsible; plan safeguards that need staff together with the HR departmentresourcescontrolling departmentPM 13KZ-02 at least 90% in the next quarter
KV-07VP-01MFA for the remaining six editorial accountsquick winR-08PM 1324 of 24 accounts with MFA
KV-08VP-02mandatory field for the requirement identifier in the ticketing systemquick winR-04PM 13no safeguard without reference to a requirement
KV-09VP-03findings from vulnerability scans with a risk reference in the registerquick winISBPM 14every high-criticality finding on portal assets with a reference to a risk
KV-10EV-09survey the status of the practice DEV for the form logic in AS-02 (PM 14) and establish the procedure for developing form logic (DEV.1.1 to DEV.1.2)resources, after the ISB post is filledR-08 / ISBPM 14 and PM 17all DEV entries with status (PM 14); DEV.1.1 to DEV.1.2 fulfilled (PM 17)

VP-04 and VP-05 did not get an entry of their own: VP-04 is absorbed into KV-03 and KV-05, and VP-05 was implemented as a change to the deadline of the existing safeguard for KONF.13.5.1.

Cycle from the audit findings FS-01 to FS-08 and metric KZ-04 via the nonconformities NK-01 to NK-06 with root cause analysis and the three systemic weaknesses SW-1 to SW-3 to the corrective and improvement plan KV-01 to KV-10, on into the implementation plan and to the effectiveness review in PM 15: 7 effective, 1 partially effective (KV-10), 1 open (KV-06), 1 not effective (KV-02). An arrow from KV-02 marked "objective missed" leads back into the risk assessment to the new risk RR-05. From above, the improvement potentials VP-01 to VP-05 flow into the plan, and a return path shows that open entries go into the second cycle.
Continual improvement in the fictitious case according to BSI Standard 300-1 ch. 6.1 to 6.4. Own illustration, as of 1 November 2026.

Effectiveness review: what worked and what did not

Under chapter 6.4, the implemented safeguards are checked for effectiveness, with targeted tests and reviews once implementation is complete, and the results are documented. In the catalogue, VRB.6.1 requires effectiveness to be tested regularly. The review was carried out by the ISB staff unit, which has been staffed since PM 13. The entries it implemented itself or shares responsibility for (KV-04, KV-05, KV-09, KV-10) were re-checked on a sample basis by the internal audit department of municipality K03, so that nobody assesses their own work alone. The review in PM 15 showed:

EntryTest (fictitious)ResultAssessment
KV-01comparison of the local account lists of all 46 systemsno shared account in regular operation; three emergency accounts documented as exceptionseffective
KV-02recovery test with six samplesall samples complete; applications accepted after 26 hoursnot effective: completeness achieved, time objective missed
KV-03three consecutive patch reports46 of 46 systemseffective
KV-04status survey of the 14 requirements8 fulfilled, 3 SOLLTE (SHOULD) not fulfilled (KONF.12.4, KONF.12.5, KONF.12.1.11), 3 KANN (MAY) not fulfilled, each surveyed for AS-25 and AS-21; STM.2.1.2 and STM.2.1.3 therefore fulfilled againeffective
KV-05cross-check of the former "not applicable" entries and the self-reportscomplete; found in the process: GC.9.1.1.1.1 (sufficient resources for the ISB) had been recorded as fulfilled since part 3, although the ISB worked only part-time; corrected and fulfilled with the appointment in PM 13effective
KV-06KZ-02 in the following quarternot yet measurableopen
KV-07, KV-08, KV-09configuration and ticket exports, register24 of 24 accounts with MFA; no safeguard without a reference; all findings with a risk referenceeffective
KV-10status survey of the 34 DEV entries for AS-02status of all 34 entries surveyed in PM 14: 7 fulfilled, 25 not fulfilled, 2 not applicable; procedure in draft, deadline PM 17partially effective, procedure open

KV-02 shows why evaluation is a step of its own. The safeguard has been implemented and the gap in the backup closed, and yet the objective was missed. The new cause: restoring runs over a connection from the backup storage with too little bandwidth. Under chapter 6, findings like this trigger a cycle of the risk assessment.

What goes back into the risk assessment

Chapter 6 provides for vulnerabilities and changed threat situations identified during improvement to be taken into account in the risk assessment. In the case this affects three entries of the register from part 3 and one new risk.

RiskReason for reassessmentResult (fictitious)
RR-01two vulnerability findings on the citizen portal (FS-08, KV-09)both remedied; rating stays medium
RR-02event SV-01, MFA complete (KV-07)rating stays medium; limited acceptance period extended until the next review and approved again
RR-03move postponed again (EV-11)stays medium; the limited acceptance period ends in PM 20, a decision is needed then
RR-05 (new)KV-02: recovery takes longer than objective Z-03occasional, limited: low, and therefore acceptable under the IZM's criteria

Open decision OF-07: RR-05 is acceptable under the acceptance criteria, but objective Z-03 from the policy has been missed. The two do not fit together. Executive management must either invest in faster restoration or change Z-03. The question depends on OF-01, the classification of the availability of GP-A, and is therefore on the agenda of management review MB-02 at the start of the second cycle. The IZM reviews the risk assessment as a whole at least annually and when significant changes occur, as provided (Annex 3, criterion 35).

Result of part 5: final balance of the first cycle

The balance updates the status list from part 3: with the corrections from the audit, the practice DEV surveyed in PM 14 (KV-10), the 14 requirements reported later and the safeguards completed by PM 15. The package now comprises 944 entries: 942 from the catalogue and two of the IZM's own.

Modal verbEntriesfulfillednot fulfillednot applicablePart 3 for comparison (fulfilled / not fulfilled / not applicable)
MUSS (MUST)14914180117 / 27 / 5
SOLLTE58954442 (40 temporary, 2 permanent)3480 / 65 / 33
KANN20642163138 / 164 / 1
Total9447272134635 / 256 / 39

What lies behind the figures. The open MUSS requirements are the five procedural requirements of the practice DEV for the form logic (KV-10), PERF.5.1, because the procedure for new threats is still missing, NOT.1.1 and GC.1.1 (see below). Of the 39 "not applicable" entries from part 3, four remain: KONF.3.3, NOT.4.5 and, for the form logic, DEV.3.4 (no password processing) and DEV.4.7 (no binary code, the scripts are interpreted). According to its guidance, DEV.4.6 applies analogously to the interpreter options for interpreted languages and is therefore applicable, in the case not fulfilled. The other 35 no longer apply, 3 as a result of the audit and 32 as a result of decision EV-09. Of the KANN requirements, the four chosen in risk treatment have been implemented (BER.4.1.2, DET.6.2.1, TEST.3.1.11, TEST.4.1.1); NOT.4.12 remains not fulfilled because the copy at K05 is not geo-redundant within the meaning of the guidance. The 40 temporarily unfulfilled SOLLTE requirements still include NOT.4.16.1 and NOT.4.1: the IZM will only count them as fulfilled after a second complete half-yearly test with the corrected backup job; the missed time objective from KV-02 is recorded separately as RR-05. Added to these are GC.3.1.3 (agreement with K11 missing), EIG-02 and 20 requirements of the practice DEV. The two permanent ones are, unchanged, GEB.1.4 and TEST.3.1.5.

Is the first cycle complete? The guidance on GC.1.1 states that the requirement „ist erst dann als erfüllt anzusehen, wenn die komplette Vorgehensweise mindestens einmal vollständig durchlaufen wurde“ (our translation: "is only to be regarded as fulfilled once the complete approach has been run through in full at least once"). The IZM has run through all five process steps for GP-A. The guidance also requires the requirements for the ISMS to be „standardkonform umgesetzt“ (our translation: "implemented in conformity with the standard"). As long as seven further MUSS requirements are open, this is not demonstrated. The IZM therefore follows the cautious reading, continues to record GC.1.1 as not fulfilled and will review the status as soon as KV-10, PERF.5.1 and NOT.1.1 are done. Whether "in full" also refers to the entire scope, that is GP-B to GP-D as well, is left open by the guidance. The IZM has noted this as interpretation question OF-08.

What goes into the second cycle

Chapter 6.3 includes the corrective and improvement plan in the implementation plan, and chapter 5.5 re-examines the package at every validation. For the IZM this means the second cycle starts with the open entries from the first.

TopicOriginNext step (fictitious)
GP-B Pay fees onlineEV-03model the payment service provider as a cloud service; according to the build of 29 Oct 2026, the categories Outsourcing and Cloud services add 38 requirements
K13 joiningvalidation part 4include the connection and interface in the boundary of the information domain
OF-01 and OF-07 availability and objective Z-03part 1, part 5decision in MB-02
OF-05 server roompart 3, EV-11decision before the limited acceptance period of RR-03 ends in PM 20
OF-03 login servicepart 2check specifically in the second audit
OF-06 practice DEV for procured softwarepart 4, EV-09the IZM applies DEV only to its own form logic; whether the DEV requirements with the Applications category are not applicable to procured software or have to be evidenced through the manufacturer's obligations is open
OF-08 reach of GC.1.1part 5monitor the interpretation, adjust the status if necessary
L-01 agreement K11part 1escalation to the association assembly
BSI performance metricspart 4compare with KZ-01 to KZ-06 once published

Whether the IZM will seek ISO 27001 certification on the basis of Grundschutz++ has not been decided. This case file is not evidence of certification. What an audit in the certification procedure requires is described on the page Certification.

The full case file and the methodology behind it

The five parts can be read individually. Anyone who wants to read the file in one go starts with part 1; every identifier can be traced back to where it first appears.

  1. Survey and planning
  2. Requirements analysis
  3. Implementation
  4. Monitoring
  5. Improvement (this page)

Methodology: BSI Standard 300-1, Assessing requirements and documenting deviations, Risk analysis, Security concept.

Blackfort Technology supports updating the implementation plan, validating the requirements and preparing the next management review, see Consulting.

Rights notice: References from BSI Standard 300-1 "Methodik Grundschutz++" (Grundschutz++ methodology), version 1.0 of 20 October 2026, © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI page on Grundschutz++. They are not licensed under CC BY-SA 4.0; the licence notice at the end of the page applies only to the extracts from the catalogue data.

Frequently asked questions

What is a nonconformity in Grundschutz++?
Under BSI Standard 300-1 ch. 6.1, a deviation exists where requirements are not fulfilled to the intended extent. It is recorded and examined for immediate and underlying causes, recurrence, similar cases and systemic weaknesses; proposals for correction are derived from this.
How do you check the effectiveness of corrective actions?
With measurable criteria defined in advance for each safeguard and with targeted tests or reviews after implementation; the results are documented (300-1 ch. 6.4). In the catalogue, VRB.6.1 requires effectiveness to be tested regularly. An implemented safeguard can still be ineffective, as KV-02 shows in the case.
When is the first PDCA cycle in Grundschutz++ complete?
The guidance on catalogue requirement GC.1.1 only treats the requirement as fulfilled once the complete approach has been run through in full at least once, and takes "established" to mean that the requirements for the ISMS have been implemented in conformity with the standard. Whether this applies to the first business process or to the entire scope is left open by the guidance. In the case, GC.1.1 therefore remains not fulfilled after the first cycle.
Where does the corrective and improvement plan belong?
In the implementation plan. 300-1 ch. 6.3 requires the corrective and improvement proposals to be embedded in a plan of their own, prioritised by resources, quick wins and greatest improvement potential, and that plan to be included in the implementation plan.

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859 of 2026-10-30)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

  • Verbatim partial quotations from the guidance on GC.1.1; paraphrased guidance on DEV.4.6; identifiers, titles and shortened requirement texts of GC.1.1, GC.9.1.1.1.1, VRB.2.1, VRB.4.1, VRB.4.2, VRB.5.1, VRB.6.1, PERS.2.3.3, BER.1.4, BER.3.16, BER.5.9, NOT.4.1, NOT.4.16.1, KONF.8.1, KONF.12.4, KONF.12.5, KONF.12.1.11, KONF.13.5.1, DEV.1.1, DEV.2.4, DEV.3.4, DEV.4.6, DEV.4.7, DEV.4.10, DEV.6.1 and PERF.5.1; paraphrased summaries of the guidance on VRB.2.1 and BER.3.16: BSI State-of-the-Art Library, Grundschutz++ user catalogue (build 2026-10-29, commit c3f37859 of 2026-10-30), retrieved 2026-11-01. Shortened, translated or edited by Blackfort Technology.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.