Grundschutz ISMS in operation: organising recurring tasks

A Grundschutz ISMS in operation depends on recurring tasks: checking the implementation status, reviewing the risk assessment, carrying out internal audits, preparing the management review, validating requirements. BSI Standard 300-1 of the Bundesamt für Sicherheit in der Informationstechnik (BSI), the German Federal Office for Information Security, and the Grundschutz++ user catalogue (Anwenderkatalog) stipulate that these tasks take place. In most cases you set the cycle yourself, because „regelmäßig“ (our translation: "regularly") is a parameter. This page collects the recurring obligations with their references and gives you two working tools: an annual calendar for the tasks you can plan and an event matrix for the work that an event triggers.

Lantern room of a lighthouse at dusk: a glowing Fresnel lens in a brass mount, in front of it on the iron floor a folded polishing cloth and a brass oil can, calm sea behind

What recurs: the obligations with references

300-1 sets a fixed minimum cycle for an operational task in one place only: the risk assessment is „mindestens jährlich sowie bei wesentlichen Änderungen überprüft“ (our translation: "reviewed at least annually and in the event of significant changes") (ch. 4.2.3; likewise Annex 3, criterion 35). Everything else is „regelmäßig“, „kontinuierlich“ or „anlassbezogen“ (our translation: "regularly", "continuously" or "as occasion requires"). The table summarises what recurs in operation.

TaskProvision in 300-1Requirement in the catalogue (modal verb, parameter)Cycle as prescribed
Check the implementation status of all requirementsCh. 4.1.1: check completely for every requirementUMS.1.1 (MUSS, i.e. MUST; „regelmäßig“)to be set by you
Track progress of the implementation plan and update the planCh. 4.5: follow up continuously, at regular intervals; plan as a living documentUMS.6.1, UMS.6.2 (MUSS); PERF.1.2 (MUSS, „regelmäßige“ review and updating)continuous, review to be set by you
Review the risk assessmentCh. 4.2.3; Annex 3, criterion 35Methodology in GC.12.1 and RISK.1.1at least annually and in the event of planned or actual significant changes
Follow up time-limited risk acceptancesAnnex 3, criterion 28: set a time limit-at the end of the set period
Evaluate the performance of the ISMSCh. 5.1: design is free as long as uniform requirements are pendingPERF.1.1 (MUSS)to be set by you
Plan the internal audit programme and carry out auditsCh. 5.2: audit programme with objectives, risks, scope and frequencyPERF.3.1 (MUSS); PERF.3.1.2 risk-based planning (MUSS)according to the audit programme
Prepare the management report, carry out the management reviewCh. 5.3: top management checks suitability, adequacy, effectiveness; „Regelmäßigkeit der Bewertung“ (our translation: "regularity of the review") as an aspectPERF.4.1 (MUSS, „regelmäßig“ and as occasion requires), PERF.4.2 (MUSS, „regelmäßig“)to be set by you, plus as occasion requires
Evaluate monitoringCh. 5.4: procedures for incident detection, vulnerabilities and new threatsPERF.5.1 (MUSS, „regelmäßigen“ monitoring)ongoing, evaluation to be set by you
Validate requirementsCh. 5.5: changes in the information domain, in the library, in blueprints, in the methodologyPERF.1.3 (MUSS, „regelmäßig“)to be set by you
Check compliance with obligationsCh. 2.2: compliance managementPERF.2.1 (SOLLTE, i.e. SHOULD; „regelmäßig“ and as occasion requires)to be set by you, plus as occasion requires
Evaluate nonconformities, test the effectiveness of correctionsCh. 6.1 and 6.4VRB.2.2 (MUSS, „regelmäßig“), VRB.6.1 (MUSS, „regelmäßig“)to be set by you
Control documentsCh. 2.9: procedure across the entire life cycleGC.11.1 (MUSS)according to the control procedure

There are also subject-matter requirements with a cycle, for example NOT.4.16.1 (check restoration „regelmäßig“ using representative samples, SOLLTE) or SENS.1.2 (check the success of awareness raising „regelmäßig“ against objective criteria, SOLLTE). In the build of 29 October 2026, 68 parameters carry the label „regelmäßig“ (own count). All of them belong in the calendar with their set value. How to set and record the values is shown in Blueprints and parameters.

Annual calendar: an example to adapt

Fictitious example. The tasks and references come from 300-1 and the user catalogue. The months and cycles are our own choices for an assumed institution with two top management meetings on the ISMS per year and a financial year equal to the calendar year. Adopt the structure and set your own dates.

PeriodTaskResultResponsible (example)Reference
JanuarySet the audit programme for the year: objectives, risks of the programme, scope, audit teamAudit programme, noted by top managementInformation security officer (ISB), head of internal auditCh. 5.2.1; PERF.3.1
JanuaryCheck implementation status (quarter 1)Status list with date and checking personISB with those responsible for implementationCh. 4.1.1; UMS.1.1
FebruaryValidation of requirements: new build of the library, blueprints, changes in the information domainValidation note, changes to the packageISBCh. 5.5; PERF.1.3
MarchReview of the risk assessmentUpdated risk register, residual risks for approvalISB, risk ownersCh. 4.2.3; Annex 3, criterion 35
AprilCheck implementation status (quarter 2); restoration test, first half-yearStatus list; test recordISB; IT operationsUMS.1.1; NOT.4.16.1
MayPrepare the management reportManagement report with audit results, performance evaluation, incidents, status of risk treatmentISBCh. 5.3; PERF.4.1
JuneManagement review 1Minutes, decisions, approved resourcesTop managementCh. 5.3; PERF.4.2
JulyCheck implementation status (quarter 3); check compliance with obligationsStatus list; compliance noteISB; compliance functionUMS.1.1; PERF.2.1
SeptemberComplete internal audits according to the programme; restoration test, second half-yearAudit reports; test recordAudit team; IT operationsCh. 5.2.2; NOT.4.16.1
OctoberCheck implementation status (quarter 4); evaluate nonconformities from the audits, transfer the correction and improvement plan into the implementation planStatus list; correction and improvement planISBUMS.1.1; ch. 6.1 and 6.3; VRB.2.2
NovemberPrepare the management report; evaluation of corrections implementedManagement report; evaluation resultISBCh. 5.3 and 6.4; VRB.6.1
DecemberManagement review 2 with resources for the following year; evaluate the audit programmeMinutes, decisions; evaluation of the audit programmeTop management; ISBCh. 5.3 and 5.2.2; GC.8.1
ongoingProgress of the implementation plan, monitoring, document controlMaintained plan, monitoring evaluations, controlled documentsISB, IT operationsCh. 4.5, 5.4, 2.9; UMS.6.1, PERF.5.1, GC.11.1

You should also enter two BSI dates for 2027. According to the milestone plan (Meilensteinplan), the concept for performance measurement will be integrated into the methodology on 26 February 2027, and by 31 March 2027 all requirements of the methodology practices are to have performance indicators. After that, you should align your own performance evaluation with these requirements. Until then, institutions are free in the design under ch. 5.1. Which indicators you can present to top management is shown in Management review and indicators.

Annual wheel with twelve months. Outside, the tasks you can plan: audit programme in January, validation in February, review of the risk assessment in March, management reviews in June and December, status checks in every quarter. Inside, the events that trigger work outside the cycle: change in the information domain, new catalogue build, security incident, audit finding, change of role. Two marked BSI dates: 26 Feb 2027 performance measurement, 31 Mar 2027 indicators.
Annual calendar and events in Grundschutz operations, fictitious example with our own cycles; tasks according to BSI Standard 300-1 (version 1.0) and the Grundschutz++ user catalogue (build 2026-10-29). Own illustration.

Event matrix: what triggers work outside the cycle

Many obligations are triggered by an event, independently of the calendar. The matrix assigns the follow-up tasks with their references to each event. For every event, decide who reports it and who initiates the follow-up tasks. Otherwise it falls between the dates.

EventFollow-up tasksReference
Significant change in the information domain (new site, new application, outsourcing)Update scope and assets; check the selection of blueprints; validate requirements; review the risk assessmentCh. 3.1, 3.3, 5.5; Annex 3, criterion 35
New build of the State-of-the-Art Library (Stand-der-Technik-Bibliothek) or new version of the methodologyCompare identifiers and texts against the package; assess changed parameters and new requirements; document the resultCh. 5.5; PERF.1.3
New or changed business processDocument the process, determine protection requirements and have them approved by top management; for high protection requirements, a risk assessmentCh. 2.5, 2.6, 2.10, 2.11
Security-relevant project, such as introducing a new systemInvolve and inform the ISB or another role of the security organisation at the defined points in timeCh. 2.8; GC.10.1.2
Security incidentHandling according to the incident procedure; evaluation as potential for improvement; inclusion in the management reportCh. 5.4, 6.2, 5.3
New vulnerability or new threatAssess according to the monitoring procedures and take into account in the risk assessmentCh. 5.4
Finding from an internal or external auditPlan and implement safeguards; root cause analysis; correction and improvement plan into the implementation planCh. 5.2.2, 6.1, 6.3
A requirement will foreseeably remain not fulfilled permanentlyChange the classification from temporary to permanent; risk assessment; submit the residual risk to top management for approvalCh. 4.1.2; Annex 3, criteria 30 and 34
Time limit of a temporary risk acceptance expiresReassess and have a new decision taken, or complete the safeguardAnnex 3, criterion 28
New statutory or contractual obligationRecord the obligation, extend the requirements package, check complianceCh. 2.2, 3.4.3; STM.2.1.7; PERF.2.1
Change in an ISMS role (such as ISB, risk owner)Deputy takes over; appoint a qualified successor; reassign responsibilities in the implementation planGC.9.1.1.2, GC.9.1.1.4; ch. 4.4
Safeguard is delayed against the implementation planUse the escalation path; adjust the plan; report status to those responsible and to top managementCh. 4.5

One event can hit several rows. Outsourcing a system to a cloud service is at the same time a change in the information domain, possibly a security-relevant project and a new contractual obligation. Check every reported event against the whole matrix for this reason.

Organising operations

Calendar and matrix only work if they are maintained in one place. For responsibilities and deadlines, 300-1 recommends a project management or ticketing system (ch. 4.4). The same system suits the recurring tasks: one ticket per date with reference, result document and responsibility. For checks, ch. 4.3 requires the date and the checking person, and for automated checks also the tool, time and result. If the ticketing system produces this information when a ticket is closed, the evidence arises along the way.

Pay attention to separation of roles. Whoever implements a safeguard should not also track its progress, because ch. 4.5 requires a possible conflict of interest to be prevented through an appropriate allocation of roles. For internal audit, PERF.3.1.3 requires professionally qualified and independent auditors. Who takes on which task over the year is set out on the page Roles and responsibilities.

Plan the dependencies between the dates. The management review relies on audit results, the performance evaluation and the status of risk treatment (ch. 5.3). If audits and the risk review come after the report, the report lacks its basis. In the example calendar, the risk review in March and the audits up to September therefore each come before a management report.

Grundschutz++ is a new methodology, and the BSI announces additions. Keep a slot free in the calendar for checking new publications, for example as part of the validation. What changes in operation compared with classic IT-Grundschutz is shown in the comparison of IT-Grundschutz 2023 and Grundschutz++.

Next: Roles and responsibilities · Evidence plan · Risk acceptance and residual risk · Case study: monitoring · Comparison of 2023 and Grundschutz++.

Blackfort Technology prepares the implementation and evidence plan in the package Implementation and migration. Blackfort Technology describes ongoing ISMS operation, with the role of information security officer if required, on https://www.blackfort-tec.de/en under External information security officer.

Frequently asked questions

How often must the risk assessment be reviewed in Grundschutz?
According to BSI Standard 300-1, at least annually and in the event of planned or actual significant changes (ch. 4.2.3; Annex 3, criterion 35). 300-1 sets no other fixed minimum cycle for operational tasks.
How often does a management review take place?
300-1 sets no fixed cycle. PERF.4.1 and PERF.4.2 require the management report and informing top management „regelmäßig“ (our translation: "regularly"). You set the value yourself and document it. PERF.4.1 additionally requires the report as occasion requires.
What does „regelmäßig“ (regularly) mean in Grundschutz++?
It is a parameter that the institution specifies when or after creating the requirements package (300-1, ch. 3.5). The methodology requirement STM.5.1 requires concrete values to be assigned to all parameters.
Which tasks does the ISB take on in ongoing operation?
300-1 does not assign the information security officer (ISB) an exhaustive list of tasks. In the example calendar, the ISB coordinates status checks, validation, risk review and the management report. Top management takes the decisions. The detailed allocation is shown on the page Roles and responsibilities.

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (commit c3f37859)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.