Residual risk and risk acceptance in Grundschutz++: decision, responsibility, review

In Grundschutz++, the residual risk that remains after risk treatment is approved by top management (BSI Standard 300-1, chapter 4.2.3, Annex 3, criterion 30). According to the guidance on RISK.1.3 in the user catalogue (Anwenderkatalog), the risk owner decides on the treatment of a risk, including risk acceptance, within the framework that top management has authorised. A risk outside the acceptance criteria that is not treated any further needs an exception approval from top management, a temporary acceptance needs a deadline, and for MUSS (MUST) requirements that are not fulfilled, risk acceptance is ruled out. This page sorts out the terms, shows in a matrix who decides what and provides a decision record with responsibility and review, as a template and completed.

Cream-coloured envelope with a dark blue wax seal on a dark wooden table, next to it a seal stamp with a wooden handle, a stick of sealing wax and a burning candle in a brass candlestick

Risk acceptance, residual risk, exception approval: what 300-1 distinguishes

TermMeaning in 300-1Reference
Risk appetiteto be defined by the organisation. The risk acceptance criteria build on it (300-1 contains no definition; it means how much risk the organisation is willing to take)Ch. 2.11; criterion 7
Risk acceptance criteriayardstick against which every evaluated risk is measured, defined taking the risk appetite into accountCriteria 8, 22
Risk acceptanceone of the four treatment options alongside reduction, avoidance and transferCriterion 23
Temporary risk acceptanceacceptance for a limited period. A time limit has to be setCriterion 28
Residual riskthe risk remaining after risk treatment. It is submitted to top management for approvalCh. 4.2.3; criterion 30
Exception approvalauthorisation by top management of a risk that does not meet the acceptance criteria and is not to be treated any furtherCriterion 27
Residual risk assessmentfor SOLLTE (SHOULD) requirements that are planned but not yet fulfilled. Top management approves the riskCh. 2.11

Top management authorises the framework, that is procedures, roles, criteria for identification, evaluation and acceptance, and the risk appetite, before the first decision (criterion 9). Without this framework, no acceptance has a yardstick. The user catalogue sums this up as RISK.1.5: „Risikomanagement MUSS Verfahren, Rollendefinitionen und Kriterien durch die Institutionsleitung autorisieren.“ (our translation: "Risk management MUST have procedures, role definitions and criteria authorised by top management.")

Who decides what

The matrix assigns the decision, the decision-maker and the reference to each situation. It is the basis for the fields in the decision record.

SituationDecisionWhoReference
Framework for risk assessmentauthorise procedures, roles, criteria and risk appetiteTop managementCh. 2.11; criterion 9; RISK.1.5
Risk meets the acceptance criteriaaccept and documentRisk owner. Top management authorises the residual riskCriteria 22, 29, 30
Risk does not meet the acceptance criteria and therefore has to be treateddecide on the treatment option, and for reduction the safeguardsthe organisation (ch. 4.2.3). According to the guidance on RISK.1.3, the risk owner has the authority to decide on treatmentCh. 4.2.3; criteria 23, 24; RISK.1.3
Risk still does not meet the acceptance criteria after treatmentevaluate and treat againthe organisation, following its procedureCriterion 26
Risk does not meet the criteria and is not to be treated any furtherexception approvalTop managementCriterion 27
Risk is accepted temporarilyset a time limit, documentRisk owner proposes. As residual risk, top management authorises itCriteria 28, 29, 30
Risk remaining after treatmentauthorise residual riskTop managementCh. 4.2.3; criterion 30
Safeguards decidedauthorise implementation planningRisk ownerCh. 4.2.3; criterion 31; RISK.1.10
SOLLTE requirement permanently not fulfilledrisk assessment, residual risks submitted for approvalTop management for the residual risksCh. 4.1.2; criteria 30, 34
SOLLTE requirement planned, not yet fulfilledidentify the risk not yet mitigated and report it to top management, which must bear it under ch. 4.1.1; residual risk assessmentTop managementCh. 2.11, 4.1.1; open question of interpretation, see below
MUSS requirement not fulfilledno acceptance possible. Define safeguards to fulfil itImplementation planningCh. 4.1.2
KANN (MAY) requirement not fulfilledno decision needed, implementation is optionalCh. 4.1.2
Requirement not applicableno risk decision. Document the justification, only where the requirement is functionally impossible to fulfil or the component is absentwhoever determines the statusCh. 4.1.1

On MUSS requirements, 300-1 is unambiguous: „Die Durchführung einer Risikobetrachtung kann die Erfüllung einer MUSS-Anforderung nicht ersetzen. Eine Ausnahmegenehmigung oder Risikoakzeptanz ist nicht möglich.“ (our translation: "Carrying out a risk assessment cannot replace the fulfilment of a MUSS requirement. An exception approval or risk acceptance is not possible.") (chapter 4.1.2). If permanent non-fulfilment of SOLLTE requirements accumulates, 300-1 states that a significant deviation (erhebliche Abweichung) may be found in the course of a certification. How to classify requirements correctly beforehand is explained on the page Assessing requirements, documenting deviations.

Decision path after risk evaluation: check against the acceptance criteria (criterion 22); within the criteria, accept and document (criterion 29); outside them, the risk owner chooses the treatment option (criteria 23, 24: reduction, avoidance or transfer, acceptance only by exception) and the risk is re-evaluated after treatment (criterion 26), or top management grants an exception approval (criterion 27); finally top management approves the residual risk, with a deadline for temporary acceptance and a review after twelve months at the latest. Alongside, a blocked branch: no acceptance for MUSS requirements, safeguards to fulfil them instead, with the German quotation from chapter 4.1.2 and our translation.
Who decides on acceptance and residual risk. Our own diagram based on BSI Standard 300-1, chapters 4.1.2, 4.2.3 and Annex 3, version 1.0 of 20 October 2026.

Work product: decision record

One record per decision makes it traceable and auditable. 300-1 does not prescribe a form. The fields below implement the criteria from Annex 3 and add what is needed for a later review. Mandatory content under 300-1 is marked (M).

Template

FieldContent
Record no., dateunique, with a reference from the risk register
Risk ID, object of analysis (M)from the register (criteria 11, 15)
Triggerhigh protection requirements, asset not covered, SOLLTE requirement permanently or temporarily not fulfilled
Risk description, protection goalsin one sentence; C, I, A
Evaluationfrequency, impact, level before and after treatment; comparison with the acceptance criteria (criteria 20, 22, 26)
Type of decision (M)approval of the residual risk (criterion 30) / temporary acceptance with deadline (criterion 28) / exception approval (criterion 27)
Justificationwhy the risk is accepted and which alternatives were examined
Time limit (M for temporary acceptance)date until which the acceptance applies
Conditionsconditions under which the decision applies, such as an accompanying safeguard or a threshold
Monitoringhow to tell that the risk is rising, and which safeguard then takes effect
Related safeguardsidentifiers in the implementation plan, approval of the implementation planning by the risk owner with date (criterion 31)
Risk ownername, function, date, signature
Top management (M)name, function, date, signature (criteria 27, 30)
Acknowledged byinformation security officer (ISB); where applicable data protection, affected departments
Review (M)next date, twelve months at the latest; triggers for an earlier review (criterion 35)

Completed decision record (fictitious)

Continuation of the case from the page Risk register: a grant-making foundation has reduced risk R-03-01 for its business process GP-03 from "high" to "medium". Under its acceptance criteria, "medium" is acceptable for no more than twelve months. Names and dates are invented.

FieldEntry
Record no., dateE-2026-07, 15 Dec 2026
Risk ID, object of analysisR-03-01, GP-03 Receive, review and pay out grant applications
Triggerhigh protection requirements for integrity
Risk description, protection goalsManipulation of approvals via a misused caseworker account, resulting in incorrect payments; integrity
Evaluationbefore treatment medium × considerable = high, not acceptable; after M-03-01 and M-03-02 rare × considerable = medium, acceptable for a limited period
Type of decisionapproval of the residual risk "medium" as temporary acceptance
JustificationFour-eyes approval applies above a threshold amount. Approvals below it remain with one person, because a full double check would delay processing by weeks. Examined and rejected: four-eyes approval for all amounts, outsourcing of the payment.
Time limit15 Dec 2027
Conditionsmonthly log evaluation (M-03-02) is in place; the threshold amount will not be raised
Monitoringanomalies in the monthly evaluation, accumulation of approvals just below the threshold amount; then lowering of the threshold amount, prepared as M-03-08
Related safeguardsM-03-01, M-03-02; implementation planning approved by the Head of Grants on 14 Dec 2026
Risk ownerE. Beispiel, Head of Grants, 15 Dec 2026, signed
Top managementF. Muster, Executive Board, 15 Dec 2026, signed
Acknowledged byISB, 15 Dec 2026
Review15 Dec 2027 at the latest; earlier in the event of an incident, a change to the threshold amount or a switch of the case management system

Variant: exception approval. Had the foundation rejected M-03-01 and left R-03-01 at "high", the risk would have remained outside the acceptance criteria. The type of decision is then "exception approval" under criterion 27, the justification has to explain why the risk is not treated any further although the criteria are not met, and top management signs. No deadline is expressly required for this. We still recommend one, so that the exception comes back onto the table at the annual review at the latest.

Review and decide again

The risk assessment has to be reviewed at least annually and whenever significant changes are planned or have occurred, and updated where necessary (chapter 4.2.3; criterion 35). For decision records this means: every record has a review date, and once a time limit expires the risk is re-evaluated. There is no tacit extension.

Suitable triggers for an earlier review are the events that 300-1 names elsewhere: new vulnerabilities and threats from monitoring (chapter 5.4), security incidents, changes in the organisation or in the threat situation. Incidents and changes, together with the status of risk treatment and the status of earlier management decisions, are also among the items of the management review (chapter 5.3). An extract of all open records with their deadlines is a useful document for it.

BSI Standard 200-3 describes a helpful practice here: risks that are acceptable today but are likely to rise are monitored, and additional safeguards are prepared so that they can take effect quickly when needed (chapter 6.2). The "Monitoring" field in the decision record takes up this idea.

Open questions of interpretation in the standard and the catalogue

  • SOLLTE requirements temporarily not fulfilled. For SOLLTE requirements that are included in the implementation planning but not yet fulfilled, chapter 2.11 requires a residual risk assessment with approval by top management. Chapter 4.1.1 requires the risk not yet mitigated to be identified and reported to top management, and adds: „Das durch die nicht erfüllte Anforderung bestehende Risiko muss von der Institutionsleitung getragen werden.“ (our translation: "The risk arising from the unfulfilled requirement must be borne by top management.") Chapter 4.1.2, by contrast, says: „Eine temporäre Nichterfüllung löst keine Risikobetrachtung aus.“ (our translation: "Temporary non-fulfilment does not trigger a risk assessment.") The standard leaves open how these passages fit together. We recommend documenting the residual risk briefly and having it approved, without carrying out a full risk assessment under Annex 3, and recording this reading in your risk policy.
  • Reference in the note on criterion 30. The note names criterion 31 as the place that „ausdrücklich die Ausnahmegenehmigung“ (our translation: "expressly the exception approval") governs. Going by its heading and wording, criterion 27 governs the exception approval. Criterion 31 concerns the approval of the implementation planning by the risk owners. For the decision record this makes no difference: in both cases top management authorises the exception approval and the residual risk.
  • Modal verb in the catalogue. The catalogue frames the residual risk assessment as a SOLLTE requirement: „Umsetzung SOLLTE das bestehende Restrisiko durch die nicht umgesetzten Anforderungen festlegen.“ (our translation: "Implementation SHOULD determine the existing residual risk resulting from the requirements not implemented.") (UMS.1.2, build of 29 October 2026). In chapter 2.11, 300-1 uses „muss“ (must). We follow the standard.
  • Risk appetite in the catalogue. RISK.1.5 names procedures, role definitions and criteria, criterion 9 also the risk appetite. Have the risk appetite authorised as well.

For comparison: risk acceptance in classic IT-Grundschutz

BSI Standard 200-3 lists risk acceptance as the fourth option after avoidance, reduction and transfer and requires: „Das Restrisiko muss anschließend der Leitungsebene zur Zustimmung vorgelegt werden (Risikoakzeptanz).“ (our translation: "The residual risk must then be submitted to management for approval (risk acceptance).") As reasons for accepting even higher risks, 200-3 cites, for example, damage that occurs only under very specific conditions, the lack of effective countermeasures, or costs that exceed the value to be protected (chapter 6.1).

In the IT-Grundschutz Compendium, MUSS denotes an unrestricted requirement „für die keine Risikoübernahme möglich ist“ (our translation: "for which no assumption of risk is possible"). BSI Standard 200-2 does not provide for accepting a residual risk for basic requirements (chapter 9.2). This principle remains in place in Grundschutz++ for MUSS requirements (300-1, chapter 4.1.2). 200-2 also advises documenting the decision on where residual risks are accepted „auch aus juristischen Gründen sorgfältig“ (our translation: "carefully, also for legal reasons") (chapter 9.3). Your legal department will assess what legal effect a risk decision has in your organisation.

What 300-1 regulates explicitly are the separate approvals: the risk owner authorises the implementation planning, top management the residual risk and every exception. Top management was already responsible for information security under 200-2 (chapter 2.3). 300-1 adds that decision papers are submitted to it, in particular on scope, protection requirements, sequence, resources and policy (chapter 2.10). The decision record is the appropriate form for risk decisions.

The page BSI Standard 200-3 places the procedure and assumptions of 200-3 in context. How risks are evaluated and treated up to this decision is shown on the page Risk analysis. Whether the procedure as a whole meets the 35 minimum criteria is covered on the page Risk minimum criteria. If you want to prepare decision papers for your top management or convert your risk policy to 300-1, Blackfort Technology can support you, see Consulting.

Rights notice: Short quotations from BSI Standard 300-1 „Methodik Grundschutz++“, version 1.0 of 20 October 2026, © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI page on Grundschutz++ (German); from BSI Standards 200-2 and 200-3, version 1.0, © Bundesamt für Sicherheit in der Informationstechnik 2017, source: BSI page on the BSI Standards (German); from the IT-Grundschutz Compendium, 2023 edition, © 2023 Reguvis Fachmedien GmbH and © 2023 Bundesamt für Sicherheit in der Informationstechnik, source: BSI page on the IT-Grundschutz Compendium (German). These quotations are not licensed under CC BY-SA 4.0. The licence notice at the end of the page applies only to the extracts from the catalogue data.

Frequently asked questions

Who may accept residual risks?
Under BSI Standard 300-1, top management: the risks remaining after risk treatment are submitted to it for approval (chapter 4.2.3, minimum criterion 30). According to the guidance on RISK.1.3, the risk owner decides on treatment and authorises the implementation planning (criterion 31).
What is the difference between risk acceptance and residual risk?
Risk acceptance is a treatment option for an evaluated risk. Residual risk is what remains after treatment, whichever option was chosen. In our reading, an accepted risk is also a residual risk and is therefore authorised by top management.
Can a MUSS requirement be dropped by way of risk acceptance?
No. For MUSS requirements that are not fulfilled, 300-1 rules out exception approval and risk acceptance. Safeguards to fulfil them have to be defined (chapter 4.1.2).
How long does a risk acceptance apply?
A temporary acceptance applies until the deadline set (minimum criterion 28). Independently of this, the risk assessment has to be reviewed at least annually and in the event of significant changes (criterion 35).
Does a SOLLTE requirement that is temporarily not fulfilled need a risk acceptance?
300-1 requires in chapter 2.11 a residual risk assessment with approval by top management, and in chapter 4.1.1 that the risk be reported to top management, which must bear it. Chapter 4.1.2 says that temporary non-fulfilment does not trigger a risk assessment. This is an open question of interpretation. We recommend a brief documented approval of the residual risk.

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (State-of-the-Art Library, commit c3f37859 of 2026-10-30)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.