Risk register: template and completed example under BSI Standard 300-1

Under BSI Standard 300-1, a risk register records every risk from the risk assessment with minimum content (Mindestangaben): unique ID, object of analysis, risk description, protection goals, risk level and risk owner, and for risks to be treated also priority, treatment option and a reference to the safeguards (Annex 3, minimum criterion (Mindestkriterium) 15). The standard does not prescribe a template. This page derives the columns from the minimum criteria, provides a risk register template to adopt and shows a completed register of a fictitious foundation with five risks covering all the triggers that 300-1 recognises.

Large open ledger with empty table columns on an oak standing desk, a brass ruler and a ribbon bookmark on top, lit by a banker lamp, shelves with identical volumes behind

What content 300-1 requires for the risk register

300-1 mentions the risk register in two places. Under risk identification it states that the identified risks „werden einem Risikoeigentümer zugewiesen und im Risikoregister dokumentiert“ (our translation: "are assigned to a risk owner and documented in the risk register") (ch. 4.2.1). Minimum criterion 15 sets out the minimum content and adds: „Das Risikoregister wird im weiteren Verlauf um die Angaben aus Risikobewertung und Risikobehandlung ergänzt.“ (our translation: "As the process continues, the risk register is supplemented with the information from risk evaluation and risk treatment.") Further criteria from Annex 3 determine what has to be recorded for a risk. In summary:

ItemObligationReference in 300-1
Unique IDminimum contentCriterion 15
Object of analysis (business process, critical asset)minimum content; to be documented for each risk assessmentCriteria 11, 13, 15
Risk descriptionminimum contentCriterion 15
Protection goals affected, at least confidentiality, integrity, availabilityminimum contentCriteria 14, 15
Risk owner; unless otherwise specified, the business process ownerminimum contentCriteria 15, 16; ch. 4.2.1
Frequency of occurrence for a defined period and impact of damage, with justificationfrom the evaluationCriteria 18, 19
Risk levelminimum contentCriteria 15, 20
Comparison with the risk acceptance criteriafor every riskCriterion 22
Priorityminimum content for risks to be treatedCriteria 15, 21
Risk treatment option: reduction, avoidance, transfer or acceptanceminimum content for risks to be treatedCriteria 15, 23
Reference to the assigned safeguards, traceableminimum content for risks to be treatedCriteria 15, 25
Time limit for temporary acceptancemandatory for temporarily accepted risksCriterion 28
Documentation of accepted risksmandatoryCriterion 29
Authorisation of the residual risks by top management, for exceptions under criterion 27mandatory; the register is an obvious place for the referenceCriteria 27, 30
Approval of the implementation planning by the risk ownermandatory; in the register as a referenceCriterion 31
Date of the last and next reviewreview at least annually and in the event of significant changes; the date field is our recommendationCriterion 35

The user catalogue (Anwenderkatalog) adds the role: „Risikomanagement MUSS die Rolle des Risikoeigentümers mit den notwendigen Aufgaben und Befugnissen verankern.“ (our translation: "Risk management MUST establish the role of the risk owner with the necessary tasks and authorities.") (RISK.1.3). According to the guidance, the risk owner is responsible for the treatment and has the authority to decide on risk treatment. 300-1 does not specify who maintains the register technically; settle this in your risk policy, for example with the information security officer (ISB). Each risk owner is accountable for their entries.

Work product 1: risk register template

The template arranges the columns in the order in which they are filled in during the process. Columns mandatory under 300-1 are marked (M), the others are our recommendation so that the register supports decisions without follow-up questions.

ColumnContent and permitted valuesFilled in during
ID (M)permanently unique, never reused, for example R-[process]-[sequential number]identification
Triggerhigh protection requirements / asset not adequately covered / SOLLTE (SHOULD) requirement permanently not fulfilled / residual risk of a planned SOLLTE requirement (ch. 2.11)identification
Object of analysis (M)business process with identifier, where applicable critical assetidentification
Risk description (M)cause, event, consequence in one sentenceidentification
Elementary threatsG 0.1 to G 0.47; for SOLLTE requirements permanently not fulfilled, those assigned in the catalogue (criterion 17)identification
Related requirementidentifier of the catalogue requirement or own requirement, if the trigger is a requirementidentification
Protection goals (M)C, I, A, other goals where applicableidentification
Risk owner (M)role and personidentification
Existing safeguardsimplemented and planned safeguards with status (criterion 12)identification and evaluation
Frequency of occurrence with justificationlevel on your scale, reference periodevaluation
Impact of damage with justificationlevel on your scaleevaluation
Risk level (M)from frequency and impact according to your matrixevaluation
Comparison with acceptance criteriaacceptable / acceptable for a limited period / not acceptableevaluation
Priority (M if treated)rankingevaluation
Treatment option (M if treated)reduction / avoidance / transfer / acceptancetreatment
Safeguards (M if treated)identifiers of the safeguards in the implementation plantreatment
Risk level after treatmentexpected level after implementation of the safeguardsre-evaluation (criterion 26)
Decisionreference to the decision record: approval of residual risk, temporary acceptance with deadline, exception approval; date, decision-makerapproval
Approval of implementation planningdate, risk ownerapproval
Statusidentified / evaluated / under treatment / temporarily accepted / accepted / closedongoing
Last and next reviewdate; no later than twelve months after the last one, earlier in the event of a significant changeongoing
Change historydate, person, what changedongoing

300-1 leaves open whether you keep the register as a spreadsheet, in an ISMS tool or in a ticketing system. What matters is that the mapping between risks and safeguards remains traceable in both directions (criterion 25): the register refers to the safeguards, the implementation plan to the risks.

Life cycle of an entry in the risk register: identified with ID, object of analysis, description, protection goals and owner; evaluated with frequency, impact, level and comparison; under treatment with option and safeguards (criteria 23 to 25), with a loop back to re-evaluation under criterion 26; risks within the acceptance criteria go directly to approval without treatment (criteria 22, 29); then approval of the residual risk by top management, status accepted or temporarily accepted, review at least annually and in the event of significant changes (criterion 35) with a loop back to identification.
Life cycle of a risk in the register with the minimum criteria from Annex 3. Own illustration based on BSI Standard 300-1, ch. 4.2 and Annex 3, version 1.0 of 20 October 2026.

Work product 2: completed risk register (fictitious)

Fictitious example. A grant-making foundation accepts grant applications through an online portal, reviews them in its case management system and pays out approved funds (business process GP-03). For GP-03, integrity is "high": manipulated approvals could trigger incorrect payments on a scale that would be considerable for the foundation and cause lasting damage to its reputation. This matches the definition of "high" and one of the scenarios that 300-1 offers as guidance (ch. 2.6). Confidentiality and availability are "normal". The Executive Board authorised the scales, matrix and acceptance criteria in advance. They correspond to the case on the risk analysis page: "low" is accepted, "medium" is acceptable for a limited period of at most twelve months, "high" and "very high" must be treated. Requirements from the user catalogue are real, everything else is invented.

ColumnR-03-01R-03-02R-03-03R-03-04
Triggerhigh protection requirements (integrity)SOLLTE requirement permanently not fulfilledasset not adequately coveredhigh protection requirements (integrity)
Object of analysisGP-03GP-03, asset grants case management systemGP-03, asset proposal module for grant amountsGP-03, asset online portal
Risk descriptionApprovals are manipulated via a misused caseworker account because one person alone can approve and release the payment; consequence: incorrect paymentsPasswords of accounts in the case management system are found by repeated guessing because the legacy module cannot lock accounts after failed attemptsRules of the in-house proposal module are changed unnoticed, grant amounts turn out systematically too highOffice documents uploaded with applications contain malicious code that runs when opened in the grants department
Elementary threatsG 0.32 Misuse of authorisation, G 0.22 Manipulation of informationaccording to the catalogue for BER.3.11: G 0.36 Identity theft, G 0.30 Unauthorised use or administration of devices and systems, G 0.32G 0.22, G 0.46 Loss of integrity of sensitive informationG 0.39 Malware
Related requirementnoneBER.3.11 „Anmeldeversuchsgrenze an der Anwendung“ (login attempt limit on the application) (SOLLTE): „Berechtigung für Anwendungen SOLLTE weitere Anmeldeversuche nach Erreichen von [einem maximalen Schwellwert an] fehlgeschlagenen Versuchen vorübergehend blockieren.“ (our translation: "Authorisation for applications SHOULD temporarily block further login attempts once [a maximum threshold of] failed attempts has been reached.")none; gap from the modellingnone
Protection goalsintegrityintegrity, confidentialityintegrityintegrity, availability
Risk ownerHead of Grants (process owner)Head of GrantsHead of GrantsHead of Grants
Existing safeguardsrole concept in the case management system, logging of approvals (evaluated only when there is cause)password rules, login only from the internal networkno approval of rule changesvirus scanner on the portal
Frequency, justificationmedium: twelve people with full rights, no check before paymentrare: internal access only, personal accountsmedium: rules are maintained by the specialist unit without the four-eyes principlefrequent: upload open to all applicants
Impact, justificationconsiderable: incorrect payments, recovery claims, reputational damageconsiderable: access to approval functionsconsiderable: many grant notices affected before it is noticedlimited: workstations isolated, recovery within one day
Risk levelhighmediumhighmedium
Comparisonnot acceptableacceptable for a limited periodnot acceptableacceptable for a limited period
Priority1324
Treatment optionreductionreductionreductionreduction
SafeguardsM-03-01 four-eyes approval above a threshold amount; M-03-02 monthly evaluation of the approval logsM-03-05 monitoring of failed logins with an alert to IT operations and account lockout by operationsM-03-03 own requirement EIG-03-01: rule changes only after approval by a second person; M-03-04 checksum over the rule file, daily comparisonM-03-06 portal accepts PDF only, Office formats are rejected
Level after treatmentmediumlowlowlow
Decisionresidual risk "medium" accepted for a limited period until 15 Dec 2027, record E-2026-07, Executive Board on 15 Dec 2026residual risk "low" accepted, record E-2026-08, Executive Board on 15 Dec 2026residual risk "low" accepted, record E-2026-09, Executive Board on 15 Dec 2026residual risk "low" accepted, record E-2026-10, Executive Board on 15 Dec 2026
Approval of implementation planningHead of Grants, 14 Dec 2026Head of Grants, 14 Dec 2026Head of Grants, 14 Dec 2026Head of Grants, 14 Dec 2026
Statusunder treatmentunder treatmentunder treatmentunder treatment
Next reviewno later than 15 Dec 2027no later than 15 Dec 2027, also when the legacy module is replacedno later than 15 Dec 2027no later than 15 Dec 2027

The fifth entry concerns a SOLLTE requirement whose fulfilment is already planned. For this case, 300-1 requires a residual risk assessment approved by top management (ch. 2.11) and that the risk not yet mitigated is reported to top management (ch. 4.1.1). The catalogue expresses this as UMS.1.2: „Umsetzung SOLLTE das bestehende Restrisiko durch die nicht umgesetzten Anforderungen festlegen.“ (our translation: "Implementation SHOULD determine the existing residual risk resulting from the requirements not implemented.") According to the guidance, these risks can be consolidated to make them easier for top management to follow. A separate, brief entry is sufficient for this:

ColumnR-03-05
Triggerresidual risk of a planned SOLLTE requirement not yet fulfilled
Related requirementDET.3.1 „Protokollierung sicherheitsrelevanter Ereignisse“ (logging of security-relevant events) (SOLLTE), parameter [eine bestimmte Frist] (a specific period) set to twelve months; threats according to the catalogue G 0.37, G 0.32, G 0.29
Risk descriptionUntil central logging is introduced, logins to the portal can only be traced back seven days; misuse that is noticed later can no longer be investigated
Protection goals, ownerintegrity; Head of Grants
Risk levelmedium, limited until implementation
Safeguard and deadlineM-03-07 central logging, completion 31 Mar 2027
Decisionresidual risk approved until 31 Mar 2027, record E-2026-11, Executive Board on 15 Dec 2026
Statustemporarily accepted; close as soon as DET.3.1 is fulfilled

300-1 is not consistent on whether SOLLTE requirements that are temporarily not fulfilled require a residual risk assessment: ch. 2.11 requires one, ch. 4.1.2 states that temporary non-fulfilment does not trigger a risk assessment. We treat this as an open question of interpretation and keep the entry because it takes little effort and top management has to be informed in any case (ch. 4.1.1). The risk acceptance and residual risk page shows what the corresponding decision records look like.

Maintaining the register

  • Review. The risk assessment must be reviewed at least annually and in the event of planned or actual significant changes (criterion 35). In the example, this would be the replacement of the legacy module for R-03-02 or a new payment service provider.
  • New findings. Under ch. 5.4, procedures must be established that take vulnerabilities and newly emerging threats into account in the risk assessment. Specify who turns them into a new entry or a re-evaluation.
  • Link to the implementation plan. In the guidance on RISK.1.10, the catalogue lists, among other things, the requirement description, responsible unit, deadlines, priorities, status, risks with justification, and the date of approval and signature of the risk owner as contents of an implementation plan. What it contains must match the register.
  • Reporting to top management. The status of risk treatment is one of the items of the management review (ch. 5.3). An extract from the register with level, option, status and open deadlines is a sufficient basis. The management review and indicators page shows how to present the status to top management.
  • Delete nothing. Closed risks remain in the register with date and reason. For safeguards, 300-1 recommends a history (ch. 4.3), and the same logic helps with the register.

Checklist before an audit

Check questionBasis
Does every risk have an ID, an object of analysis, a description, protection goals, a level and an owner?Criterion 15
Does every risk to be treated have a priority, an option and a reference to safeguards, and does the implementation plan lead back to the risk?Criteria 15, 25
For every risk outside the acceptance criteria, are there either safeguards and a re-evaluation or an exception approval by top management?Criteria 26, 27
Does every temporary acceptance have a deadline, and has none of the deadlines expired?Criterion 28
Is every residual risk authorised by top management, with date and reference?Criterion 30
Is there an entry with the threats from the catalogue for every SOLLTE requirement permanently not fulfilled?Criteria 17, 34
Is the last review less than twelve months old?Criterion 35
Is no MUSS (MUST) requirement listed as "accepted" in the register?Ch. 4.1.2

Risk register under 200-3 and under 300-1

BSI Standard 200-3 does not require a register but mentions one: to document the monitoring of risks and the adjustment of safeguards, it is „in der Praxis üblich, hierfür Risikoregister oder Risikoverzeichnisse anzulegen“ (our translation: "common practice to set up risk registers or risk inventories for this purpose") (ch. 6.2). 200-3 records the results of the analysis in a threat overview per target object, with risk category and the treatment option chosen.

Anyone adopting such an inventory adds three things. First, the risk owner for each risk as a mandatory field. In its preparatory work, 200-3 only asks whether risks are assigned to the risk owners (ch. 2). Second, the object of analysis: 200-3 starts from target objects and allows business processes (ch. 2), while 300-1 treats the business process as the normal case and critical assets as a supplement (criterion 13). Third, the references to the authorisation of residual risks and the approval of implementation planning, which 300-1 lists as separate criteria.

You can check whether your procedure meets all 35 minimum criteria as a whole on the risk minimum criteria page. The risk analysis page shows how the entries are created, from trigger to treatment. If you want to convert an existing risk inventory to 300-1 or set up a new register, Blackfort Technology can support you, see consulting.

Rights notice: Short quotations from BSI Standard 300-1 „Methodik Grundschutz++“, version 1.0 of 20 October 2026, © Bundesamt für Sicherheit in der Informationstechnik 2026, source: BSI page on Grundschutz++ (German); from BSI Standard 200-3 „Risikoanalyse auf der Basis von IT-Grundschutz“, version 1.0, © Bundesamt für Sicherheit in der Informationstechnik 2017, source: BSI page on BSI Standard 200-3 (German). These quotations are not licensed under CC BY-SA 4.0. The licence notice at the end of the page applies only to the extracts from the catalogue data.

Frequently asked questions

What must a risk register contain according to the BSI?
Under BSI Standard 300-1, Annex 3, minimum criterion 15, for every risk at least a unique ID, the object of analysis, a risk description, the protection goals affected, the risk level and the risk owner. For risks to be treated, also priority, treatment option and a reference to the safeguards.
Is there a risk register template from the BSI?
Not in the sources evaluated here. BSI Standard 300-1 specifies minimum content but no format. The template on this page implements the minimum content and adds fields for decision, status and review.
Who is responsible for the risk register?
Every risk has a risk owner, unless otherwise specified the owner of the business process concerned (300-1, ch. 4.2.1). The standard does not specify who maintains the register technically. You settle that in your risk policy.
Do accepted risks belong in the risk register?
Yes. Accepted risks must be documented (minimum criterion 29), temporarily accepted risks with a time limit (criterion 28). Residual risks must be authorised by top management (criterion 30).
How often does the risk register have to be updated?
The risk assessment must be reviewed at least annually and in the event of planned or actual significant changes (minimum criterion 35). In addition, the register changes with every new evaluation, safeguard or decision.

Get in touch

Discuss your project

Briefly describe where you stand. In a free initial call we work out what you need.

Request an initial call

Sources

Quotations from BSI standards and BSI web pages are © Federal Office for Information Security (BSI) and are reproduced verbatim, in quotation marks and with source reference. This is an independent offering, not an offering of the BSI.

Last updated
2026-11-06
Technically reviewed
2026-11-06
Catalogue version
Grundschutz++ user catalogue, build 2026-10-29 (State-of-the-Art Library, commit c3f37859 of 2026-10-30)

Licence notice

This page contains excerpts from catalogue data published by the German Federal Office for Information Security (BSI), licensed under CC BY-SA 4.0. The excerpts are shared under the same licence. This licence covers only these catalogue excerpts; quotations from BSI standards are © BSI and reproduced as quotations with source reference.

This content provides general technical and organisational information on IT-Grundschutz and Grundschutz++ and does not constitute legal advice (no legal services within the meaning of the German RDG). It replaces neither an audit nor a decision by the certification body.